My WebLink
|
Help
|
About
|
Sign Out
Home
2017_11-28_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2017
>
2017_11-28_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 2:22:52 PM
Creation date
12/8/2017 2:14:29 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/28/2017
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.5. Recommendations from Recent Plans and Studies <br />Several recent planning efforts have been completed that identify potential improvements to <br />Roseville's transportation system. This section describes these studies and summarizes their <br />recommendations. <br />2.5.1 MnPASS System Study Phases 2 and 3 <br />In 2010, MnDOT completed Phase 2 of its MnPASS system study and is currently updating its <br />list of MnPASS expansion corridors as part of Phase 3. MnPASS managed lane improvements <br />are intended to help manage congestion by providing new capacity parallel to general purpose <br />traffic lanes, in which all vehicles (except transit) are required to pay a toll. The MnPASS lanes <br />would be priced so that free-flow operation is always maintained by increasing the price as <br />volume in the managed lane increases. During Phase 2, TH 36 and I -35W in Roseville were <br />identified as "Tier 2" corridors to be carried forward for further study and built as financing <br />and approvals are obtained and engineering challenges resolved. The TPP identifies the I -35W <br />MnPASS lane as a funded project and the TH 36 MnPASS lane as an unfunded project in the <br />current revenue scenario. <br />2.5.2 Roseville Pathway Master Plan <br />Concurrent to this comprehensive plan update, the City of Roseville is updating its Pathway <br />Master Plan, which was first prepared in 2008. The pathway master plan identifies, evaluates, <br />and prioritizes locations for bicycle and pedestrian facilities. Recommendations from the <br />pathway plan update have been incorporated into this plan where applicable. <br />2.5.3 A Line Extension Evaluation <br />In 2016 Metro Transit studied the feasibility of extending the A Line north <br />from its current terminus at the Rosedale Center Mall in Roseville to the <br />City of Arden Hills, connecting with the planned Rice Creek Commons <br />project on the site of the former Twin Cities Army Ammunition Plant <br />(TCAAP). This extension could provide new high -frequency transit <br />service to areas of Roseville not currently served. The study identified a <br />preferred alignment in Roseville along Snelling Avenue with preliminary <br />station locations at County Road C and Lydia Avenue. The study <br />recommended a phased implementation of this extension and identified <br />roles for local communities in the near-term, mid-term, and long-term. <br />Near-term strategies for communities include implementing pedestrian - <br />friendly development and accounting for BRT when completing local <br />roadway projects. Mid-term strategies include focusing growth and <br />development along the extension corridor and scoping road projects to <br />include civil infrastructure for the A Line extension. Long-term strategies <br />include maximizing development potential along the corridor and <br />partnering in construction of the A Line extension. <br />ChapterX-Transportation (DRAFT) Page X-25 <br />Adopted XXXXXXXXX XX, 2017 <br />DRAFT <br />STATION LO TIONS <br />I <br />ANDALIGNMENT <br />OPTIONSUNDER <br />REFINEMENT <br />ChapterX-Transportation (DRAFT) Page X-25 <br />Adopted XXXXXXXXX XX, 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.