My WebLink
|
Help
|
About
|
Sign Out
Home
Ord_1536
Roseville
>
City Council
>
City Council Ordinances
>
1500
>
Ord_1536
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2018 1:03:58 PM
Creation date
12/13/2017 10:31:46 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Meeting Date
12/4/2017
Meeting Type
Regular
Ordinance #
1536
Ordinance Title
AN ORDINANCE AMENDING CHAPTER 314.05, FEE SCHEDULE ADOPTING THE 2018 FEE SCHEDULE
Ordinance Date Passed
12/4/2017
Ordinance Date Published
12/12/2017
Publication Type
Ordinance
Publication Newspaper
Review
Publication Date (lst)
12/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville 2018 Fee Schedule <br /> Building Permit and Plan/Project Review Fees (continued) <br /> City 2017 2018 <br /> Fee Description Code Amount Amount Comments <br /> Miscellaneous Building Permit Fees Continued: <br /> SAC administration fee 36.00 36.00 <br /> SAC research fee:hourly Rate 69.50 70.00 <br /> Shed permits(residential< 120 square feet) 52.00 52.00 <br /> Shed permits (residential 121-200 square feet) 75.00 75.00 Plus $15 Engineering fee <br /> Solar panel/renewable energy equipment install 1.28 % of job cost or $160 minimum fee <br /> Verification fee:age of structure on property 5.00 5.00 <br /> Verification fee:electrician/plumber state license 1.00 1.00 <br /> Verification fee:lead abatement certificate 5.00 1.00 <br /> Verification fee: sewer/water bond certificate 1.00 1.00 <br /> Verification fee:state contracting license 5.00 1.00 See Comment(c) <br /> Comments: <br /> (a)Fee amount if<25%of total surface is replaced not exposing sub-base,otherwise add'1 fees are imposed <br /> (b)An additional$125 fire inspection fee will be charged if using a tent or other membrane structure of 400 s.f.or larger <br /> (c)Verification fee required for all trades with State licenses or bonds <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.