My WebLink
|
Help
|
About
|
Sign Out
Home
2018 Budget and CIP
Roseville
>
Budget
>
2018 Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 11:27:20 AM
Creation date
2/2/2018 11:27:10 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division / Program:Public Works Administration <br />Organizational Responsibility: Public Works Director <br />Division / Program Description <br />Public Works Administration provides for the coordination, administration, and engineering of the City’s <br />transportation and utility infrastructure. It also provides information to the public and reviews private <br />development plans for conformance to city and cooperative agency guidelines.The Program’s activities <br />are accounted for in the General Fund. <br />2018Goals and Objectives <br />Continue to implement the City’s Comprehensive Asset Management Program into the daily work <br />flow and Capital Improvement Plan development. <br />Meet the challenge of reconstruction and rehabilitation as outlined in the 20-year Capital <br />Improvement Plan. <br />Finalize the update to the City’s Transportation Plan and Pathway Master Plan while coordinating <br />with the Community Development department on the overall City Comprehensive Plan update. <br />Identify a timeline and final project scope for the federally-funded Snelling Ave Third Lane Project. <br />Locate a new location for leased storage space and/or determine a plan for a long term solution to <br />seasonal storage needs for the maintenance divisions. <br />Identify and possibly finalize installation of an on campus solar installation. <br />Financial Summary <br />20142015201620172018$ Increase% Increase <br />ActualActualActualBudgetBudget(Decrease)(Decrease) <br />Personnel Services$754,268$872,497$745,447$785,935$831,255$45,3205.8% <br />Supplies & Materials7,88319,38911,1839,1009,100-0.0% <br />Other Services & Charges45,52136,80632,24270,55058,000(12,550)-17.8% <br />Capital Outlay------0.0% <br />Total$807,672$928,693$788,872$865,585$898,355$32,7703.8% <br />FTE's7.257.257.257.257.25 <br />2018Budget Impact Items <br />Personnel increases include a 2.25% cost-of-living increase for city staff and wage-step increases <br />for eligible employees. <br />Decrease in ‘Other Services & Charges’is due to the removal of funding for the Transportation Plan <br />update which was completed in 2017. <br />2016/2017Achievements <br />Repaved approximately 7 miles of roadway, lined 7.75 miles of sanitary sewers, replaced 1.1 miles <br />of water main, reconstructed one sanitary sewer lift station and constructed 1.23 miles of new <br />sidewalk. <br />In coordination with the Community Development department, successfully implemented the <br />Accelapermitting and licensing system for right-of-way and erosion control permits as well as <br />building and plan review permit reviews. <br />Processed over 300 right-of-way permits in 2017, a 50% increase over the average number of <br />permits. <br />Processed 57 erosion control permits and performed over 800 erosion control inspections. <br />49 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.