My WebLink
|
Help
|
About
|
Sign Out
Home
2018_02-27_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2018
>
2018_02-27_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2018 2:20:38 PM
Creation date
2/28/2018 2:17:45 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
2/27/2018
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attach en C <br />METROPOLITAN <br />C O U N C I L <br />Metropolitan Council Environmental Services (MCES) is making improvements to aging and deteriorating regional <br />sanitary sewer facilities that serve homes and businesses in the cities of Roseville and St. Paul at four project sites. <br />The project will line or replace approximately 5,000 feet of regional sanitary sewer pipe, as well as rehabilitate <br />manholes and meter stations. <br />Project Need <br />A substantial amount of the sewer system <br />in the metro area was last updated in the <br />1960s and 1970s. Since then, pipes have <br />deteriorated and need to be repaired or <br />replaced. MCES has responded by developing <br />a long-term plan in collaboration with local <br />government to rehabilitate sections of sewer <br />pipe, beginning in areas of critical need. <br />Project Location <br />The Avon St. site is located on Avon <br />St. between County Rd. D and Brenner <br />Ave. Construction is scheduled to occur <br />between March and September 2018. <br />Work will include removing and <br />replacing part of the sewer pipe <br />near County Rd. D and lining part <br />of the sewer pipe near Brenner Ave. <br />Construction crews will also replace <br />a manhole and meter station at the <br />intersection of Avon St. and County <br />Rd. D. A temporary wastewater <br />conveyance pipe will be set up along <br />the west side of Avon St. The pipe will <br />be used to transfer wastewater during <br />construction. <br />1 <br />z <br />Road D el <br />N up <br />II Staging <br />Avon Street <br />♦ Temporary Conveyance Discharge Staten <br />• Temporary Conveyance Pumping Station <br />Tenipurary Dunveyanue <br />— Sewer Hehabilitatwntxcavation <br />ra Sewer Rehabilitation Relining <br />Park Path <br />LEY PARK <br />�u <br />ro` <br />N <br />a <br />O <br />3 <br />Q <br />e a <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.