Laserfiche WebLink
4. The failure to maintain the required bonds and/or insurance; <br />5. The failure to complete the work in a timely manner; unless a permit extension is <br />obtained or unless the failure to complete the work is due to reasons beyond the <br />permittee's control; or <br />6. The failure to correct, in a timely manner, work that does not conform to a condition <br />indicated on an order issued pursuant to Section 707.18 of this Chapter. <br />B. Written Notice of Breach: If the Director determines that the permittee has committed a <br />substantial breach of a term or condition of any statute, ordinance, rule, regulation or <br />any condition of the permit, the Director shall make a written demand upon the <br />permittee to remedy such violation. The demand shall state that continued violations <br />may be cause for revocation of the permit. A substantial breach, as stated above, will <br />allow the Director, at his or her discretion, to place additional or revised conditions on <br />the permit. <br />C. Response to Notice of Breach: Within 24 hours of receiving notification of the breach, <br />permittee shall contact the Director with a plan, acceptable to the Director, that will cure <br />the breach. Permittee's failure to so contact the Director, or the permittee's failure to <br />submit an acceptable plan, or permittee's failure to reasonably implement the approved <br />plan, shall be cause for immediate revocation of the permit. Further, permittee's failure <br />to so contact the Director, or the permittee's failure to submit an acceptable plan, or <br />permittee's failure to reasonably implement the approved plan, shall automatically place <br />the permittee on probation for one full year. <br />D. Cause For Probation: From time to time, the Director may establish a list of conditions <br />of the permit, which if breached will automatically place the permittee on probation for <br />one full year, such as, but not limited to, working out of the allotted time period or <br />working on right of way grossly outside of the permit authorization. <br />E. Automatic Revocation: If a permittee, while on probation, commits a breach as outlined <br />above, permittee's permit will automatically be revoked and permittee will not be <br />allowed further permits for one full year, except for emergency repairs, or as allowed in <br />writing by the Director. <br />F. Reimbursement of City Costs: If a permit is revoked, the permittee shall also reimburse <br />the City for the City's reasonable costs, including restoration costs and the costs of <br />collection and reasonable attorney fees incurred in connection with such revocation. <br />(Ord. 1209, 8-24-1998) <br />707.22: MAPPING DATA: <br />A. Rule: Each registrant and permittee shall provide mapping information in a form <br />required by the City in accordance with Minnesota Rules 7819.4000 and 7819.4100. <br />Within 90 days following completion of any work pursuant to a permit, the permittee <br />shall provide the Director accurate maps and drawings certifying the "as -built" location <br />of all equipment installed, owned and maintained by the permittee. Such maps and <br />drawings shall include the horizontal and vertical location of all facilities and equipment <br />and shall be provided consistent with the City's electronic mapping system when <br />practical or as a condition imposed by the Director. Failure to provide maps and <br />drawings pursuant to this Subsection shall be grounds for revoking the permit holder's <br />registration. (Ord. 1333, 3-13-2006) <br />B. Service Laterals: All permits issued for the installation or repair of Service Laterals, <br />other than minor repairs as defined in Minnesota Rules 7560.0150 subpart 2, shall <br />require the Permittee's use of appropriate means of establishing the horizontal locations <br />of installed Service Laterals, and the Service Lateral vertical locations in those cases <br />where the Director reasonably requires it. Permittees or their subcontractors shall <br />submit to the Director evidence satisfactory to the Director of the installed Service <br />Lateral locations. Compliance with this subdivision 2 and with applicable Gopher State <br />One Call law and Minnesota Rules governing Service Laterals installed after December <br />