My WebLink
|
Help
|
About
|
Sign Out
Home
2018-6-5_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2018
>
2018-6-5_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2018 10:41:01 AM
Creation date
6/8/2018 10:40:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville Pathway Master Plan <br /> <br />2.P ROCESS <br />Alongside the development of the 2040 Comprehensive Plan Update and the <br />corresponding 2040 Transportation Plan Update, the Public Works, Environment, and <br />Transportation Commission (PWETC) led the update of the Pathway Master Plan. Over <br />the course of three PWTEC meetings, the PWETC discussed the current plan, reviewed <br />and identified modifications to the policies and standards, discussed remaining <br />pathway gaps, and provided an updated scoring and ranking criteria process in order <br />to ensure a quantified scoring system for preferred pathway segments. City staff’s <br />role was to provide support and guidance by setting up meetings, gathering <br />information, answering questions, editing the plan, and otherwise assisting the PWETC <br />as needed. <br /> <br /> <br />Page 9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.