My WebLink
|
Help
|
About
|
Sign Out
Home
2018-6-5_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2018
>
2018-6-5_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2018 10:41:01 AM
Creation date
6/8/2018 10:40:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville Pathway Master Plan <br /> <br />3.B ACKGROUND <br />History of Roseville’s Pathways <br />Trail development in Roseville started during the early 1970s with a small loop in <br />Sandcastle Park which led to the construction of the very popular Central Park system, <br />the 1995 construction of the County Road C pathway, and the 1997 expansion of the <br />Acorn Park trails. In 1975, a comprehensive plan for trails was developed similar to <br />the network that is being proposed with this document. The desire was to have an <br />integrated system of paths that connected residents to area parks. The intent was <br />mainly recreational. <br /> <br />The City’s first pathway plan created a surge of development in the 1970s locating <br />pathways mainly in the parks. City code was changed later to dictate that developers <br />were responsible for providing pedestrian accommodations to their new facility, so <br />sidewalks started to sprout up in commercial and industrial areas. Outside funding <br />sources became more available in the 1980s, which also increased the development <br />of pathways including a growing interest in basic pathway facilities for bike commuters. <br /> <br />As a follow-up to Vista 2000, on September 11, 1995 the City Council appointed a <br />volunteer advisory committee to work with staff to develop a comprehensive pathway <br />master plan. The advisory committee was made up of fourteen Roseville residents and <br />three staff members. This plan was approved by City Council in 1997 and updated in <br />2003. The main focus of the 2003 update was to re-prioritize the list of pathway <br />project that were identified within the 1997 plan, eliminating the ones that had been <br />constructed and creating new priorities. A similar process occurred in 2008 as part of <br />the last Pathways Master Plan Update. <br />Current Conditions <br />Demographics <br />The 2015 American Community Survey (a five-year average of general population <br />characteristics) indicates that Roseville has a stable population; this is mainly due to <br />limited developable land. Some additional demographic information is provided <br />below: <br />Roseville’s population was 33,690 in 2000. In 2015, the population was 34,948. <br />This is approximately an increase of four percent since 2000. <br />The City’s forecasted 2040 population is expected to remain near current levels. <br />The percent of the population over the age of 50 has continued to increase. <br />However, Roseville is seeing an increase in younger residents and families as the <br />percentage of residents in the 20 to 34 age group has also increased between <br />2000 and 2015. <br />The overall age of Roseville is notably older than the county and the region. The <br />2015 median age of Roseville’s population was 40.8 years. This compares with <br />34.6 years for Ramsey County and 36.9 years for the region. <br />Page 11 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.