My WebLink
|
Help
|
About
|
Sign Out
Home
2018-6-5_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2018
>
2018-6-5_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2018 10:41:01 AM
Creation date
6/8/2018 10:40:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville Pathway Master Plan <br /> <br />Rosedale Transit Center south into St. Paul and ending at 46th Street Green <br />Line light rail transit (LRT) station in Minneapolis. <br />d)Fixed route bus service: Metropolitan Council provides 16 fixed routes. <br />e)Non-fixed routes: There are transit options offering door to door service at <br />reasonable rates. Each program has eligibility requirements. These services <br />are provided by Metro Mobility andRoseville Area Senior Program. <br />3)Pathways (See Attachment 4 for Existing Pathways Map) The City of Roseville <br />currently has approximately 114 miles of both on and off-road pathways. <br />a)County: There are some on-road striped shoulders that meet the minimum <br />standards as stated in the definitions. There are approximately 29 miles of <br />on-road pathways. <br />b)State: Currently there are no State pathway facilities in Roseville. The closest <br />facility is the Gateway Trail south and east of the City. <br />c)City: This system consists of the park interior pathway system and some <br />connecting routes between destinations along major roads. There are <br />approximately 81 miles of city owned and maintained off-road sidewalk and <br />trail pathway facilities. <br /> <br />Described below are the major paths that make up the majority of the City’s <br />existing pathway system. <br /> <br />Central Park Pathways <br />The pathway system in Central Park has always been popular because of its <br />proximity to attractive and diverse natural amenities, its connection to <br />numerous recreational areas and its size, which provides multiple access <br />points and lengthy paved paths. The Central Park paths are heavily used and <br />provide a very good trail experience for recreational users and a good <br />thoroughfare for utilitarian users. <br /> <br />County Road C Pathway <br />The pathway in the County Road C corridor was constructed in 1995 with <br />funding assistance from ISTEA. This path provides an essential central spine <br />through the City, connecting users to a number of City amenities like <br />commercial/retail centers, Central Park, Acorn Park, City Hall and the <br />Lexington Avenue pathway. <br /> <br />County Road B2 Pathway <br />This off-road trail provides access from the Lexington Avenue trail through the <br />Rosedale Mall shopping area. It was expanded, using federal funds, in 2005 to <br />extend from Rosedale to the west city boundary where it connects up to the <br />Minneapolis Diagonal Trail. This corridor is a major connector for students <br />within the walking area for Roseville Area Schools, providing connections to <br />Roseville High School, Parkview Elementary, and Roseville Middle School. <br /> <br />Page 13 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.