Laserfiche WebLink
City of Roseville Pathway Master Plan <br /> <br />2-Population is 2,000 to 2,999 <br />1-Population is 500 to 1,999 <br />0-Population is less than 500 <br />AND <br /> <br />Total employment within 1/4 mile of pathway <br />3-Employment is 3,000 or greater <br />2-Employment is 2,000 to 2,999 <br />1-Employment is 100 to 1,999 <br />0-Employment is less than 100 <br />Measurement tool: US Census Block Dataset <br /> <br />3)Connects to regional system. <br />Provides linkage to the larger network of pathways that extend beyond Roseville. The <br />pathway serves longer trips within Roseville and into neighboring cities. <br /> <br />3-Regional corridor (county road, regional/state trail, RBTN route) <br />2-Local pathway that directly connects to regional corridor or Parks & <br />Recreation System Master Plan Trails and Parks Constellation Link. <br />1-Pathway provides local connection only <br />Measurement tool: City’s Pathway map and regional bikeways mapping <br /> <br />4)Addresses a gap or barrier in the transportation network. <br />Addresses a pathway network gap along the transportation network and/or crosses a <br />major barrier. Eliminates a major barrier or safety concern in the pathway network <br />that may inhibit bicycle or pedestrian travel. <br />5-Provides enhanced safe crossing (grade separated or improved <br />intersection) of major highway (I-35W, TH 36, Snelling Avenue) or railroad <br />4-Completes pathway along A-Minor Arterial roadway <br />3-Completes pathway along Other Arterial roadway <br />2-Completes pathway along Major Collector roadway <br />1-Completes pathway along a Local roadway <br />Measurement tool: City’s Roadway Functional Classification Map <br /> <br />5)Connects to Transit <br />Connects bus stops, transit hubs, or provides a connection to other transit. <br />3-Transit Center or park and ride within 1/4 mile of pathway <br />2-A-BRT Station within 1/4 mile of pathway <br />1-Bus stop within 1/4 mile of pathway <br />Page 30 <br /> <br />