My WebLink
|
Help
|
About
|
Sign Out
Home
Annual_Budget_1975_001
Roseville
>
Budget
>
Annual_Budget_1975_001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2018 12:00:25 PM
Creation date
6/22/2018 11:59:40 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3o Personne� Change� <br />One additional pat,rol officer is being recognxzed f'or the Police Departmento <br />4� Reorganization <br />ao The License Bureau f'unction ha� been shi�ted from Code Enforcement to <br />Finance, <br />bo The Electrical &nspection Seruice has been combined with Code Enforcement <br />and will noi� show up as an "in-and-out" charge in the General Funde <br />Bo Other Current Expenses <br />le Enterprise �unds <br />Approximately $130,UG0 0� the gross inerease in this area is attributable to <br />the Enterpr�se �und�� �� <br />2, Program Changes <br />ae After re�iew of' T974 bids for sealcoating, it was determined that this <br />function could be more economically performed inehouse, at least for the <br />present time, <br />bo Natural expansion i� oc�u�ring in the areas of data processing, street <br />lighting, penszon �ontributions, and emplo�ee insuranceo <br />ca Whereas the equsx;y in the contingency �und was sufficent to cover 1974 <br />wage adjustments and other unprogrammed expenses, funds must be appro- <br />priated in 1975 t,o the contingency fund to handle the same type of <br />expensea <br />do The Firemen'� Re13�f Fund does not require any tax support this qear <br />and the State aids and investment income have been eliminated from the <br />budgeta <br />3� In�lation is a sfgnaf��ant factor even for maintaining the same levels of <br />servicea Gasoline is expected to cost 60% more in 1975� The cost for oniy <br />the supplies to be used in sealcoating in-house will cost the City`129% of <br />the estimated 1974 �ost of doing the whole sealcoating job by contract� <br />Maintenan�e �upplies fbr the water and sewer system are up 30% in some caseso <br />C� Capital Outlay <br />la Capital Improvements <br />ao Ski Hill <br />Snowmaking and groaming as well as grading work are being proposed in <br />an effort to upgrade the qualit� and attractiveness of the ski facilitq <br />b, Water S�stem <br />The Counc3l has approved an engzneering study o� the City water system <br />to identi�y servi�e requirements and develop recommendations for <br />
The URL can be used to link to this page
Your browser does not support the video tag.