Laserfiche WebLink
Attachment A <br /> City of Roseville 2018 Fee Schedule <br /> Building Permit and Plan/Project Review Fees (continued) <br /> City 2017 2018 <br /> Fee Description Code Amount Amount Comments <br /> 458 Miscellaneous Building Permit Fees Continued: <br /> 459 SAC administration fee 36.00 36.00 <br /> 460 SAC research fee: hourly Rate 69.50 70.00 <br /> 461 Shed permits(residential< 120 square feet) 52.00 52.00 <br /> 462 Shed permits(residential 121-200 square feet) 75.00 75.00 Plus$15 Engineering fee <br /> 463 Solar panel/renewable energyequipment install 1.28 %of job cost or $160 minimum fee <br /> 464 Verification fee: age of structure on property 5.00 5.00 <br /> 465 Verification fee: electrician/plumber state license 1.00 1.00 <br /> 466 Verification fee: lead abatement certificate 5.00 1.00 <br /> 467 Verification fee: sewer/water bond certificate 1.00 1.00 <br /> 468 Verification fee: state contracting license 5.00 1.00 See Comment(c) <br /> 469 <br /> 470 Comments: <br /> 471 (a)Fee amount if<25%of total surface is replaced not exposing sub-base,otherwise add'l fees are imposed <br /> 472 (b)An additional$125 fire inspection fee will be charged if using a tent or other membrane structure of 400 s.f. or larger <br /> 474(c)Verification fee required for all trades with State licenses or bonds <br /> 17 <br />