Laserfiche WebLink
Attachment A <br /> City of Roseville 2018 Fee Schedule <br /> Electrical Permit Fees: Community Development (continued) <br /> City 2017 2018 <br /> Electrical Permit Fee Description Code Amount Amount Comments <br /> 538 Residential panel replacement n/a $ 100.00 $ 100.00 <br /> 539 Residential sub panel n/a 40.00 40.00 <br /> 540 Minimum fee: <br /> 541 Inspection only n/a 40.00 40.00 Plus $1 State surcharge <br /> 542 Rough-in&final n/a 80.00 80.00 Plus $1 State surcharge <br /> 543 Single-family dwelling/townhouse<200 amp n/a 175.00 175.00 Plus $1 State surcharge <br /> 544 Apartment buildings (per unit) n/a 70.00 70.00 Excludes cover svc,unit feeder <br /> 545 &house panels <br /> 546 Swimming pool(up to two inspections) n/a 80.00 80.00 <br /> 547 Additions,remodels,basement additions n/a 80.00 80.00 Up to 10 circuits& 2 inspectio <br /> 548 Accessory structure: <br /> 549 Panel n/a 50.00 50.00 <br /> 550 Per circuit n/a 8.00 8.00 <br /> 551 Inspection n/a 80.00 80.00 <br /> 552 Traffic signals(per standard) n/a 7.00 7.00 <br /> 553 Street&parking lot lights(per standard) n/a 4.00 4.00 <br /> 554 Transformers&Generators: <br /> 555 Up to 10 KVA n/a 10.00 10.00 <br /> 556 11-75 KVA n/a 40.00 40.00 <br /> 557 76-299 KVA n/a 60.00 60.00 <br /> 558 299+KVA n/a 150.00 150.00 <br /> 559 Retro-fit lighting(per fixture) n/a 0.65 0.65 <br /> 560 Sign transformer(each) n/a 8.00 8.00 <br /> 561 Remote control&signal circuits(per device) n/a 0.75 0.75 <br /> 562 Re-inspection fee(in addition to others) n/a 40.00 40.00 <br /> 563 <br /> 564 Comments: <br /> 565 *Fee covers a maximum of three inspections <br /> 566 **Permit fee is doubled if work is started before permit is issued <br /> 567 ** *Minimum fee electrical permits are not refundable <br /> 21 <br />