Laserfiche WebLink
Attachment A <br /> City of Roseville 2018 Fee Schedule <br /> General Business Licenses and Permit Fees (continued) <br /> City 2017 2018 <br /> Fee Description Code Amount Amount Comments <br /> 123 Precious metal dealler 311 10,000.00 10,000.00 <br /> 124 Private hydrant inspections: <br /> 125 1-4 hydrants 801 $ 50.00 $ 50.00 <br /> 126 >4 hydrants 801 100.00 25.00 Cost per hydrant <br /> 127 Processing Fee(Permits&Contractor Licenses) n/a 2% 2%See comment'C'below <br /> 128 Public improvement contract application fee n/a 550.00 550.00 See comment'D'below <br /> 129 Recycling contractor 403 125.00 125.00 <br /> 130 Rental licensing: <br /> 131 Multi family annual inspection fee: (5-13units) 908 $ 20.00 $ 20.00 Plus$3 per unit(waived for'18) <br /> 132 Multi family annual inspection fee: (14+units) 908 - - Plus$3 per unit(waived for'18) <br /> 133 Multi family:reinstatement 908 102.00 102.00 <br /> 134 Reinspection fee 908 66.00 66.00 After 1st inspection <br /> 135 Failure to renew within 30 days ofexp. 908 500.00 500.00 Fee doubles every two weeks <br /> 136 Fee appeal to City Council 908 50.00 50.00 <br /> 137 Rental registration: <br /> 138 Housing 907 35.00 35.00 <br /> 139 Late renewal fee 907 35.00 35.00 <br /> 140 Administrative fine(per unit) 907 100.00 100.00 <br /> 141 Appeal 907 50.00 50.00 <br /> 142 Right of way permits: <br /> 143 Hole(per hole) 707 400.00 400.00 <br /> 144 Trench 707 400.00 400.00 +$0.40/lineal foot of trench <br /> 145 Boring 707 400.00 400.00 +$0.40/lineal foot of boring <br /> 146 Non-excavation(obstruction) 707 50.00 50.00 +$0.06/lineal foot <br /> 147 Roll-off container 707 50.00 50.00 <br /> 148 Extension 707 25.00 25.00 +$25.00 per week of extension <br /> 149 Oversize/overweight vehicle 707 - 30.00 <br /> 150 Penalty 707 2 times amount of standard permit <br /> 151 Curb cut 707 50.00 50.00 <br /> 152 New or revised wireless support structure 707 - 100.00 <br /> 153 Other Agency review 707 - 30.00 <br /> 154 Winter excavaction surcharge 707 - 100.00 Amount per hole <br /> 155 Sewer connection fees 802 n/a n/a See separate section below <br /> 156 Sewer usage fees 802 n/a n/a Established separately <br /> 157 Soil contamination fee(per cubic yard) 406 1.00 1.00 max$300 <br /> 158 Solid waste hauler license 402 125.00 125.00 <br /> 159 Stormwater drainage fees 803 n/a n/a Established separately <br /> 160 Stormwater impact fee(per cubic foot) 1017 22.50 22.50 <br /> 161 Stormwater residential permit: <br /> 162 Initial n/a 250.00 250.00 <br /> 163 Renewal(5 year term) n/a 100.00 100.00 <br /> 164 Stormwater Permit Review <br /> 165 Less than 1 acre 803 = 35.00 <br /> 166 1-5 acres 803 - 75.00 <br /> 167 More than 5 acres 803 - 125.00 <br /> 168 Non-compliance fine 803 - 100.00 <br /> 5 <br />