DOCUMENTS AND BIDDING OWNER.
<br /> REQUIREMENTS: Complete digital; June 21,2018
<br /> project bidding documents;pursuant Owner:City of Roseville,
<br /> r SECTION 00 11=13- to which labor,materials,or services' Minnesota
<br /> ADVERTISEMENT FOR BIDS must be fumished, are available'at /S/Pat Trudgeon
<br /> RECEIPT• _AMID .OPENING OF' www.4E2S.com or www.questcdn:.. City ManaW
<br /> PROPOSALS: led.SeaProposals 00M Y1 may download fhe digital
<br /> for the work_described_below will plan 'documents for $25.00, by (Roseville Review:June 26,July 10,
<br /> be received by the City Engineer at inputting'Quest project 85831506 on 2018)
<br /> the`2660"CMC Center Dr.,Roseville, ,the Website's Project Search page
<br /> MN 55113-1815 until July 17,:20.16 Please contact'QuestCDN.com at - -----
<br /> ,,,at 11':00 a.m.1C.D.S.T,'atwhich time 952-233-1632orinfo6questedn,00n
<br /> the.bids will'be opened and publicly for assistance in free membership
<br /> read-:for the Jumishing;'of;all labor, registration, 'downloading,, and`
<br /> materials,andf all else necessary for working with this digital ,project
<br /> the following: information.
<br /> DESCRIPTION OF WORK: An,optional, digital format on CD
<br /> Roseville" Booster Station 'maybe purchased for a.charge of
<br /> Improvements = Phase 2. City $50.00 or paper copies of the Bidding
<br /> )W{act 18-13 Documents may be obtained for
<br /> In general, the work includes the $206•bl)i,for each set of documents
<br /> following: requested,from the issuing office of
<br /> A. Replacement of select process the Engineer,Advanced,Engineering
<br /> piping,valves,and fittings associated and,Environmental Services, Inc.
<br /> With Booster Pump No.2 and N6,:6 '(AE213), 6901, E Fish Lake Road
<br /> inside of the booster station. Ste 184, Maple Grove,`MN 55369.
<br /> B. Replacement of a,portion of Checks should be made out'to AE2S,
<br /> the.exterior buried process piping, Each set of Bidding Documents Will,
<br /> fittings, and valves adjacent to the include the Project Manual and one
<br /> Booster Station.Replacement of the complete set of 11 rx 17 Drawings.
<br /> existing flow meter, All costs associated with preparation'
<br /> C. 'piping replacement'to include of Bids shall be bonne by the Bidder.:
<br /> concrete piping below the building All ousts for either digital or paper
<br /> for Booster Pumps No._.5 and No. copies are NON-REFUNDABLE. No
<br /> 6. Repair of`;interbr floor following paitial`sets will be issued. Copies of
<br /> the(replacement of the below grade the Plans and,
<br /> project manuals may
<br /> concrete piping. be examined at the offices of the
<br /> Q. .Stabilization of building Engineer or at2 360 Civic Center Dr,;''!
<br /> foundation at locations specified to Roseville,MN 55113-1815:
<br /> prevent addition4settlemertt. PLANHOLDEFtS LIST,ADDENDA
<br /> E.Addition of cast-in7place concrete AND BID TABULATION: The 1
<br /> stoops at specified entrances. planholders list, addenda and bid°'
<br /> F. Constniction of a new electrical tabulation will be available on-line at
<br /> room. Replacement of old electrical www•AE2S.com:
<br /> Cequipmentwith new electrical Bids will be received on a'lump sum:
<br /> equipment in ithe newsy constructed basis with the addition of an alternate,
<br /> electrical room unit price bid for select helical pier
<br /> f G.Replacement of Master Control installation as needed
<br /> Panel in new.electrieai room. MANDATORY PWBID
<br /> H. ':Replacement of interior. CONFERENCE:,A mandatory Pre-,
<br /> i nrechahicalr,plumbing, 'HVAC, and Bid Conference will be held for.al(.
<br /> lighting systems, prospective bidders on July 10;,2018,
<br /> COMPLETION OF WORK: All at 1:00 p.m. at the Booster Station'+
<br /> work associated with the interior Site, The City's Representatives,
<br /> electliCal replacement and pump and ;Engineer shall be present on;
<br /> replacement under the Contract must site to answer questioirs and,provide;
<br /> be Substantially complete by April access to the Booster Station for
<br /> 30, 2019 and all remaining worl) all prospective=bidders. Bidders
<br /> including:exterior underground work are required to attend the pre-bid
<br /> shall be' Substantially complete by conference,
<br /> June 30;2019. Final completion for BID_SECUAITY'r A certified check
<br /> 1 all workend closeout documentation or a`Bid Bond satisfactory to the
<br /> shaII be July,31,20,19 City of Roseville, Minnesota, in the
<br /> j BEST
<br /> VALUE. CONTRACTING: 'amount of not less than 10 percent-!
<br /> The City Believes that ony:a of the,total Bid price submitted must
<br /> contractor with good`6.xperienos accompany each Bid.
<br /> in constructing this kind of project LABOR RATES-MINIMUM WAGE
<br /> is necessary.`Two factors willbe REQUIREMENTS: This,project is
<br /> considered in the contractor selection being funded by the City of.Roseville,
<br /> process: price and performance. MN. The project is not subject to the
<br /> The process for consideration of provisions of Little Davis-Bacon Act.
<br /> roposaIs for the award of the PERFORMANCE AND,PAYMENT,
<br /> 'J
<br /> BONDS:The successful Bidder will
<br /> Protect will take into account not
<br /> only the,Contract amount proposed be required to fumish a Performance
<br /> for.construction'items, but also the Bondi. and Labor:, and Materials
<br /> pro
<br /> poser's ability and performance Payment Bond in the'amount of
<br /> on previous similar projects, within the Contract.
<br /> or outside the City of Roseville,and The Bid,Agreement,and Bonds shall i
<br /> the proposer's availability of major be conditioned upon Compliance with
<br /> equipment tot:perform this project. all provisions of the Bid Documents. 1
<br /> The evaluation criteria to be utilized PROJECT ADMINISTRATION:
<br /> will be the total proposal price divided All questions relative to this project
<br /> by the aggregate average technical prior to'the opening of bids shall be
<br /> performance score,es determined by directed'to the Engineer/Manager for
<br /> the technical evaluation committee the project. It shall be understood;
<br /> and fully set forth in the Proposing however, that no specification
<br /> Requirements Documents. The interpretations will be made by
<br /> required documentation must be telephone.
<br /> Submitted to the City.of Roseville ,Address inquiries to:
<br /> by.July 13,;2018 1 at.12:00p.m. AE2S
<br /> C.D.S.T. Attn:Aaron Vollmer P.E.
<br /> MINIMUM CONTRACTOR 6901 E Fish Lake Road Ste 184 f
<br /> QUALIFICATIONS: The Bidder Maple Grove,MN 55369'i
<br /> shall,have experience as a General Tel:763-463w5036
<br /> Contractor in the :;successful Email:Aaron.Vollmer@AE2&com
<br /> completion of at:least three (3) OWNER'S RIGHTS 'RESERVED:
<br /> Booster. Stations :and/or Water. The OWNER reserves the right
<br /> Treatment Facilities within the last to reject any or all bids; to waive
<br /> five(5)years. anyinformality informality in a bid, and to.