Laserfiche WebLink
Project Preference List Attachment 6 <br />Map <br />Ref. <br />Project Name <br />Description <br />Connects <br />Multiple <br />Destinations <br />Volume <br />Usage - <br />Population <br />Volume Usage - <br />Employment <br />Connects to <br />Regional <br />System <br />Addresses a Gap or <br />Barrier in the <br />Transportation <br />System <br />Connects to <br />Transit <br />Connects Highy <br />Density to <br />Transit or Parks <br />Total <br />Points <br />Pathway <br />Master <br />Plan <br />Rank <br />Constellat <br />ion Plan <br />Rank <br />Pathway Master <br />Plan and Parks <br />Constellation Plan <br />Rank <br />28 <br />Snelling Avenue* <br />Develop off road pathway between County Road B and County Road C <br />5 <br />1 <br />3 <br />3 <br />5 <br />3 <br />5 <br />25 <br />1 <br />1 <br />4A <br />County Road C (A) <br />Construct an on -road pathway from Lexington Avenue to Victoria St. <br />5 <br />1 <br />1 <br />3 <br />4 <br />4 <br />5 <br />23 <br />2 <br />2 <br />9 <br />Snelling Avenue South of Highway 36 <br />Complete pathways along Snelling Avenue for improved access to A-BRT transit stations. <br />2 <br />1 <br />3 <br />2 <br />5 <br />4 <br />5 <br />22 <br />3 <br />3 <br />16 <br />Rosedale to HarMar Connection <br />A edestrian bridge across Highway 36 and pathway connection between Rosedale and HarMar Mall. <br />2 <br />1 <br />1 <br />2 <br />5 <br />6 <br />5 <br />22 <br />3 <br />3 <br />12C <br />Lexington Avenue ( C) <br />Complete off-road pathway on the east side of Lexington Avenue from County Road C to County Road D. <br />4 <br />1 <br />1 <br />3 <br />4 <br />4 <br />5 <br />22 <br />3 <br />3 <br />12A <br />Lexington Avenue (A) <br />Complete off-road pathway on the east side of Lexington Avenue from Lar enteur Avenue to County Road B <br />5 <br />2 <br />1 <br />3 <br />4 <br />1 <br />5 <br />21 <br />6 <br />6 <br />12B <br />Lexington Avenue (B) <br />Complete off-road pathway on the east side of Lexington Avenue from County Road B to County Road C. <br />5 <br />1 <br />1 <br />3 <br />4 <br />1 <br />4 <br />19 <br />7 <br />7 <br />4B <br />County Road C (B) <br />Construct an on -road pathway from Victoria St to Dale St. <br />5 <br />1 <br />0 <br />3 <br />4 <br />1 <br />5 <br />19 <br />7 <br />7 <br />3A <br />County Road C-2 (A) <br />Complete both on- and off-road pathways within the County Road C-2 alignment from Snelling Avenue to Hamline <br />Ave <br />5 <br />2 <br />1 <br />3 <br />1 <br />1 <br />5 <br />18 <br />9 <br />9 <br />4C <br />County Road C (C) <br />Construct an on -road pathway from Dale St to Western Ave. <br />4 <br />1 <br />0 <br />3 <br />4 <br />1 <br />5 <br />18 <br />9 <br />9 <br />4D <br />County Road C (D) <br />Complete both on- and off-road pathways within the County Road C alignment from Western Ave to Rice St. <br />4 <br />1 <br />1 <br />3 <br />4 <br />1 <br />4 <br />18 <br />9 <br />9 <br />6 <br />Cleveland Avenue <br />Complete off-road pathway segments between County Road C and County Road D. <br />3 <br />0 <br />3 <br />2 <br />3 <br />4 <br />2 <br />17 <br />12 <br />12 <br />13 <br />Rice Street <br />Complete an off-road pathway from County Road C to the north City boundary. <br />3 <br />1 <br />1 <br />3 <br />3 <br />1 <br />5 <br />17 <br />12 <br />12 <br />25A <br />Hamline Avenue A <br />An off-road trail from County Road C to County Road C-2. <br />3 <br />1 <br />1 <br />3 <br />3 <br />1 <br />5 <br />17 <br />12 <br />12 <br />10 <br />Victoria Street (north of C) <br />Develop an on- road and off-road pathway from County Road C to County Road D. <br />6 <br />1 <br />1 <br />2 <br />3 <br />1 <br />2 <br />16 <br />15 <br />15 <br />2 <br />County Road C-2 West of Snelling <br />Develop both on -and off-road pathways within the County Road C-2 alignment from the west City Boundary to <br />Snelling Avenue. This corridor would include a pedestrian bride across I -35W. <br />2 <br />1 <br />3 <br />2 <br />1 <br />1 <br />5 <br />15 <br />16 <br />17 <br />8 <br />11 <br />TH connec 1llillp Snelling (Arden Hills) <br />Work with Arden Hills to develop a regional pathway connection along Snelling Avenue to Old Snelling Avenue in <br />Arden Hills connecting Roseville to Mounds View High School, Valentine Hills Elementary School, Bethel College, <br />Lake Johanna Park and County Road E2 commercial businesses. <br />5 <br />1 <br />1 <br />2 <br />4 <br />1 <br />1 <br />15 <br />1 16 <br />17 <br />26 <br />County Road B2 & Snelling* <br />Install a sidewalk along the north side of CR B2 between the Snelling Ramps. <br />3 <br />0 <br />1 <br />2 <br />3 <br />6 <br />0 <br />15 <br />16 <br />17 <br />25B <br />Hamline Avenue B <br />An off-road trail from County Road C-2 to County Road D. <br />3 <br />1 <br />1 <br />3 <br />3 <br />1 <br />3 <br />15 <br />16 <br />17 <br />3B <br />County Road C-2 (B) <br />Complete an off-road pathway within the County Road C-2 alignment from Lexington Ave to Victoria St. <br />3 <br />1 <br />1 <br />3 <br />1 <br />1 <br />5 <br />15 <br />16 <br />17 <br />27 <br />Tamarack Park Connection*# <br />Install a pathway connection from South McCarron's Blvd to Tamarack Park. <br />4 <br />1 <br />0 <br />2 <br />1 <br />1 <br />5 <br />14 <br />21 <br />23 <br />29 <br />Commerce Street* <br />Develop a pathway connection between Albert St and Hamline Ave <br />5 <br />1 <br />1 <br />1 <br />1 <br />4 <br />0 <br />13 <br />22 <br />26 <br />5 <br />County Road C Sidewalk <br />Construct a sidewalk on the north side of County Road C from Western to Rice Street. <br />2 <br />1 <br />1 <br />2 <br />3 <br />1 <br />2 <br />12 <br />23 <br />29 <br />7 <br />Fairvie north of B-2) <br />Development of off-road pathways between County Road C2 and County Road <br />5 <br />1 <br />0 <br />3 <br />3 <br />0 <br />0 <br />12 <br />23 <br />29 <br />31 <br />Pascal Street* <br />Develop a pathway connection between County Road B and Commerce Street <br />5 <br />1 <br />1 <br />1 <br />1 <br />3 <br />0 <br />12 <br />23 <br />29 <br />18 <br />Judith to Iona Connection# <br />Develop a pathway connection between Judith Ave and Iona Lane. <br />1 <br />1 <br />0 <br />2 <br />1 <br />1 <br />5 <br />11 <br />26 <br />34 <br />1 <br />County Road D <br />Develop athwa es, both on- and off-road, between Cleveland and Fairview Avenue. <br />3 <br />0 <br />1 <br />2 <br />3 <br />1 <br />0 <br />10 <br />27 <br />39 <br />11 <br />Dale Street Sout <br />The construction o off-street pathway from Reservoir Woods Park to Lar enteur Avenue. <br />1 <br />1 <br />0 <br />3 <br />4 <br />1 <br />0 <br />10 <br />27 <br />39 <br />15 <br />NE Diagonal RR Connection (Walnut to Co Rd C) <br />Develop a pathway connection between Cleveland Avenue and Walnut Street along County Road C or along the <br />Railroad right-of-way south of County Road C. <br />2 <br />0 <br />3 <br />3 <br />1 <br />1 <br />0 <br />10 <br />27 <br />39 <br />19 <br />Lovell to Minnesota Connection <br />Develop a pathway connection between Lovell Ave and Minnesota Street. <br />3 <br />1 <br />1 <br />1 <br />1 <br />0 <br />3 <br />10 <br />27 <br />39 <br />21 <br />Millwood to County Road C2 Link <br />Develop a pathway connection that creates a link between the corner of Millwood and Chatsworth through the <br />Ramsey County open space to County Road C2. <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />3 <br />10 <br />27 <br />39 <br />24 <br />Alta Vista Drive <br />Develop a pathway connection along Alta Vista Drive between Lar enteur Avenue and Reservoir Woods Park. <br />1 <br />1 <br />1 <br />3 <br />1 <br />1 <br />2 <br />10 <br />27 <br />39 <br />30 <br />Albert Street* <br />Develop a pathway connection between County Road B and Commerce Street <br />5 <br />1 <br />1 <br />1 <br />1 <br />1 <br />0 <br />10 <br />27 <br />39 <br />23 <br />Cohansey St to HANC Connection <br />Develop a pathway connection between Cohansey Street and HANC. <br />3 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />9 <br />34 <br />55 <br />20 <br />Villa Park Connections <br />Develop a pathway connection from Shryer Ave and from Ryan Ave into Villa Park. <br />3 <br />1 <br />0 <br />1 <br />1 <br />1 <br />1 <br />8 <br />35 <br />64 <br />17 <br />Heinel Drive Connection <br />Develop a pathway connection between S. Owasso Blvd and County Road C along Heinel Drive. <br />2 <br />1 <br />0 <br />1 <br />1 <br />1 <br />1 <br />7 <br />36 <br />68 <br />14 <br />Langton Lake Loop <br />Develop a pathway that goes around all of Langton Lake. <br />4 <br />0 <br />0 <br />1 <br />1 <br />0 <br />0 <br />6 <br />37 <br />71 <br />22 <br />Eustis to St. Croix Connection <br />Develop a pathway connection between Eustis Street and St. Croix Street. <br />1 <br />0 <br />1 <br />1 <br />1 <br />1 <br />1 <br />6 <br />37 <br />71 <br />Arterial <br />Roadway with more than 4,000 ADT, with no pathway on either side of the roadway. <br />