My WebLink
|
Help
|
About
|
Sign Out
Home
2018_08-28_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2018
>
2018_08-28_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2018 9:09:33 AM
Creation date
8/31/2018 9:06:02 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/28/2018
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEAL ENERGIES <br />A 13REEN2 COMPANY <br />40 Year Customer Cash Flow Example - Net Metering w/ Utility Bill Savings <br />Rooftop Ballasted Solar Array -124.95 kWDC Mon ocrystalline350W Solar Panels @ 100 w/99.9 kWAC SolarEdge <br />Xcel Photovoltaic Credit Rider Tariff <br />General Service Rate Plan <br />Total Annual Energy Expense Savings <br />■ Lease Terminated Early ■ Lease Runs full term M000 <br />Total Cumulative Annual Energy Expense Savings <br />■ Lease Runs full ten ■ Lease Terminated Early sp <br />The orange bars extending above the dark blue bars on S <br />the graph represent the Additional Total Cumulative <br />Annual Energy Expense Savings achieved when the Put <br />or Call to terminate the Lease early <br />m m m m <br />�p �p M N N Cl Cl <br />N Cl Cl <br />c r r N N d d A A A A A A <br />W W N N N N N N } } W W W W W W <br />} } } } } } } } } } } } } } <br />SP" <br />W <br />W <br />M <br />M <br />ra <br />SP" <br />W <br />W <br />M <br />M <br />ra <br />
The URL can be used to link to this page
Your browser does not support the video tag.