Laserfiche WebLink
Trade Secret <br />SCHEDULE B <br />Maintenance Items <br />A. Weekly performance monitoring via online monitoring system to validate performance of panels and <br />inverters, energy production, benchmark performance vs. similar systems for validation <br />B. Identify any defective equipment via on-line monitoring system <br />C. Semi-annual Site audits of system performing the following tasks <br />i. Inspect panels, inverters, and racking for physical damage <br />ii. Clean any debris on or under the solar arrays <br />iii. Ensure labels are intact <br />iv. Check for loose hanging wires, repair as necessary <br />v. Check electrical connections, tighten/torque as necessary <br />vi. Check for corrosion of electrical enclosures, repair as necessary <br />vii. Ensure roof drainage is adequate, that roof drains are not clogged, and confirm there are no <br />signs of pooling water in the vicinity of the solar array <br />D. Management of System Component Warranty Claims <br />6 <br />