My WebLink
|
Help
|
About
|
Sign Out
Home
2018_09-25_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2018
>
2018_09-25_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2018 10:57:59 AM
Creation date
9/27/2018 9:44:41 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/25/2018
Commission/Committee - Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trade Secret <br />SCHEDULE A <br />System Components <br />The Energy System is comprised of the following System Components: <br />1. UL Listed and approved Solar Panels: 595 - Monocrystalline350W @ 350 kW DC each <br />2. UL listed and approved DC/AC inverters: 5 - SolarEdge SE33k 480V 3Ph Inverter @ 33.30 kW AC each <br />3. Power Optimizers: 298 - SolarEdge P730 Power Optimizers <br />4. Solar Panel Racking / mounting system: Unirac, PanelClaw (or equivalent) Ballasted Racking @ approximately 100 <br />5. Electrical components including but not limited to conductive wiring, ground circuitry, conduit, junction boxes, disconnects, <br />switches, over -current protection, and any associated hardware necessary to complete the installation of the solar electric <br />modules and interconnect with the Site's existing electric service. <br />6. Monitoring equipment and web -based remote system monitoring. Customer is responsible for bringing and providing internet <br />service at the installation location (typically the electrical room). <br />7. If not provided by the Utility, a Revenue grade meter for measuring and monitoring electrical production from the Energy <br />System. <br />The Parties agree that the Energy System does NOT include the following unless purchased as an option (except where Seller includes <br />them in the Installation Costs): <br />1. Any structural improvements to the building required to support the Energy System and the System Components. <br />2. Batteries or emergency back-up power capability. <br />3. Any Upgrades to Customer's electrical service to bring their service up to code. <br />4. Third -party fees for web -based monitoring of the Energy System. <br />5. Fees charged by Xcel for upgrading Customer's service above $5000. Any fees in excess of the $5000 will be added to the <br />Installation Cost, and the Year 1 Power Payment rate specified in the Power Purchase Agreement will be adjusted to recover <br />the same. <br />SCHEDULE B <br />Contact Information for Parties <br />Real Property Owner: <br />Customer's Authorized Representative: <br />City of Roseville <br />2660 Civic Center Drive, Roseville, MN 55113 <br />Marcus Culver <br />651-792-7041 <br />Seller/Installer: Ideal Energies, LLC <br />Chris Psihos t. (612)928-5008 <br />chris.psihos@idealenergies.com <br />5810 Nicollet Avenue Minneapolis, MN 55419 <br />Project Electrician(s): Greene Electric, LLC <br />Joaquin Thomas, Master Electrician <br />Russell Goetz, Master Electrician <br />t. (612)928-5008 f: (612)928-5009 <br />5810 Nicollet Avenue Minneapolis, MN 55419 <br />License EA719118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.