My WebLink
|
Help
|
About
|
Sign Out
Home
2018-11-1_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2018
>
2018-11-1_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 2:45:09 PM
Creation date
10/25/2018 2:44:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Perimeter Drainage System <br />1. The perimeter drainage system should be televised to further evaluate its condition and <br />identify specific areas needing special attention when reconstructed. <br />2. The perimeter drainage system should be reconstructed as part of major improvements to <br />improve the perimeter drainage. <br />Underdrain System <br />1. The underdrain system is working and not in need of reconstruction. Yet opportunities for <br />enhancements to the system to benefit overall improvements should be considered. <br />Perimeter Fence <br />1. The perimeter fence will need to be reconstructed to accommodate the grade beam. <br />Expansion joint improvements are recommended. <br />Hockey Net Screening <br />1. The net cable support columns need some repair to their concrete bases and both the cable <br />support and netting should be replaced. <br /> <br />Sports Lighting System <br />1. While no improvements are recommended at this time to the sports lighting, sports lighting <br />technology has improved and should be considered for its energy efficiency. <br />Priorities <br />Priorities for improvement were developed by first identifying all critical systems at the Guidant <br />John Rose Minnesota Oval establishing life expectancies for those systems and mapping the <br />actual service life available for each. This spreadsheet was used in addition to field inspections <br />of conditions, discussions with operating staff and our experience with similar systems to <br />establish the urgency of each proposed improvement. The spreadsheet is included at the back <br />of the report. <br />Priority ratings are as follows: <br />High Priority – Five or less years of life expectancy <br />Medium Priority – Greater than five or less than ten years of life expectancy <br />Low Priority – 10 or more years of life expectancy <br />242424 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.