My WebLink
|
Help
|
About
|
Sign Out
Home
2018-11-1_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2018
>
2018-11-1_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 2:45:09 PM
Creation date
10/25/2018 2:44:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT Guidant John Rose Minnesota OVAL Project and Cost List 10-15-18 <br />Based on Professional Condition Assessment <br />1.Condenser and Components $ 540,000 <br />Current condenser (evaporation tower) is original to system, has outlived its useful <br />life and is in need of replacement <br />2.Repair, Replace and Insulate Expansion Joints $ 725,000 <br />Expansion joints are being undermined and in need of repair and upgrade to newer <br />technology <br />3.Various Mechanical Items/Needs $ 366,000 <br />Ammonia Alarm System ($30K), Brine Filtration System ($30K), Expansion Tank <br />Replacement ($24k), Piping Drain System ($132K), Replace Brine ($30K), Chiller <br />Tube Inspection ($30K), Microprocessors ($40K), Compressors ($50k) <br />4.Perimeter Paving/Turf Improvements and Fencing/Netting - Training Track $ 210,000 <br />Mill and blacktop perimeter (training Track) of OVAL/turf improvements <br />All this is done to also improve drainage systems to prevent water from undermining <br />the slab <br />5.Padding and Fence System $ 450,000 <br />Replace fence surrounding the OVAL to secure padding system <br />Replace padding system around to OVAL to better meet world competition standards <br />6.Renovate Banquet Facility and Rooftops $ 205,000 <br />Replace carpet, divider door <br />Replace Rooftop units <br />7.Lobby/Mechanical Room and Banquet Center Roof Replacement $ 245,000 <br />8.Replace OVAL rink divider pads $ 30,000 <br />Replace aging pads used to divide infield from track activities <br />New pads provide latest materials to prevent injury <br />9.Bathroom Remodel $ 95,000 <br />To improve condition and access to upper level bathrooms from the OVAL for <br />major events and large crowds in the facility <br />10.Scoreboard Replacement$ 250,000 <br />Subtotal before Contingency and Soft Costs $ 3,116,000 <br /> Contingency and Soft Costs (35%) $ 1,090,600 <br />TOTAL WITH CONTINGENCY AND SOFT COSTS $ 4,206,600 <br />717171 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.