My WebLink
|
Help
|
About
|
Sign Out
Home
2018-10-2_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2018
>
2018-10-2_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 2:47:08 PM
Creation date
10/25/2018 2:47:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
89 Treatment is useful in a significant location area and for while the canopy of new trees grow. <br />90 Once the new canopy is created with new tree growth, it is anticipated that the Ash Tree will be <br />91 removed as necessary creating anend to the treatment program. <br />92 If all existing Ash Trees in Roseville were to be removed and replaced with today’s dollars, <br />93 following is an estimated cost: <br />94 To remove the remaining Ash Trees of 1700, we canassume that it would cost some <br />95 over $400,000 <br />96 To replace on a one for one for 1700 trees, we canassume it may cost some over <br />97$600,000 <br />98 Treatment of Ash Trees would then go away which we could assume $10,000 per <br />99 year? <br />3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.