My WebLink
|
Help
|
About
|
Sign Out
Home
2018_10-23_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2018
>
2018_10-23_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 10:15:16 AM
Creation date
11/29/2018 10:13:57 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
10/23/2018
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Major Maintenance Activities: <br />• Re -calibrated all plow trucks. <br />• Paved Midland Gardens Park and Unity Park. <br />• Paved north side Bennett Lake from Fishing Pier to Waterfall. <br />• Started adding black dirt on Parks Paving Projects. <br />• All Streetscape irrigation systems winterized and blew out. <br />• Ongoing street patching and spray patching. <br />• Ongoing compost deliveries and site maintenance. <br />• Ongoing catch basin and manhole repairs. <br />• Ongoing sign repairs. <br />• Ongoing miscellaneous tree trimming. <br />• Continued cleaning sanitary sewer mains. <br />• Performed annual maintenance on the City Hall and PW generators. <br />• Performed preventative maintenance on all overhead doors in the Police and Public <br />Works buildings. <br />• Assisted with fire extinguisher testing in Public Works. <br />• Collected water samples for bacteriological testing. <br />• Continued exercising large water valves 12" and larger. <br />• Collected water samples for disinfection by-products. <br />• Continued replacing meter heads and radios. <br />• Completed the city Hall elevator modernization project. <br />• Continued working with engineers and contractors on the 2018 PMP, the Booster Station <br />Phases 1 & 2 projects, the Lounge, Walsh Pond and the Femwood Lift Station projects. <br />• Worked with architect and contractors on the Willow Room remodeling project. <br />• Continued collecting I/I flow data in 10 manholes every two weeks. <br />Attachments: <br />A: 2018 Project Map <br />B: September Development Activity Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.