Laserfiche WebLink
City of Roseville 2019 Fee Schedule <br /> Permit and Plan/Project Review Fees (continued) <br /> City 2018 2019 <br /> Fee Description Code Amount Amount Comments <br /> Miscellaneous Permit Fees Continued: <br /> SAC administration fee 36.00 36.00 <br /> SAC research fee: hourly Rate 70.00 70.00 <br /> Shed permits(residential< 120 square feet) 52.00 52.00 <br /> Shed permits(residential 121-200 square feet) 75.00 75.00 Plus $15 Engineering fee <br /> Solar panel/renewable energy equipment install 1.28 %of job cost or $160 minimum fee <br /> Verification fee: age of structure on property 5.00 5.00 <br /> Verification fee: electrician/plumber state 1.00 1.00 <br /> Verification fee: lead abatement certificate 1.00 1.00 <br /> Verification fee: sewer/water bond certificate 1.00 1.00 <br /> Verification fee: state contracting license 1.00 1.00 See Comment(c) <br /> Comments: <br /> (a)Fee amount if<25%of total surface is replaced not exposing sub-base, otherwise add'l fees are imposed <br /> (b;An additional$125 fire inspection fee will be charged if using a tent or other membrane structure of 400 s.f.or large <br /> (c)Verification fee required for all trades with State licenses or bonds <br /> 16 <br />