My WebLink
|
Help
|
About
|
Sign Out
Home
2019-1-3_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2019
>
2019-1-3_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 3:28:13 PM
Creation date
12/27/2018 3:28:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
damage, but no loss of protective coatings, staining of fastenings and <br />welds. Deterioration has no significant impact on strength, appearance and <br />safety. Only minor work required <br />3Acceptable - Equipment function sound, but appearance affected by minor <br />defects e.g. slight impact damage, vandalism, flaking of protective <br />coatings, staining of steel and fastenings. Deterioration beginning to affect <br />the strength, appearance, and safety of the equipment. Some work <br />required <br />4Poor - Equipment functioning but with problems due to significant defects <br />e.g. loss of protective coatings, corrosion of steel, fastenings <br />and welds, impact damage, loosening of fastenings and supports, likely to <br />cause a marked deterioration in strength, appearance and safety. Some <br />replacement/ rehabilitation needed within 1-2 years <br />5 Very Poor - Equipment has serious problems and has failed or is about to <br />fail in the near future, causing unacceptable strength, stability, <br />safety and appearance. Urgent removal or replacement/ rehabilitation <br />required <br /> <br /> Industry useful life 20 years <br /> Park Improvement Plan: <br /> Play surface on an as needed basis based on quarterly inspection program. <br />Capital Improvement Plan: <br /> Poured in place surface replacement on 10 year interval per industry <br />standards <br />o Inspection by staff quarterly. Adjust interval according to <br />inspection program. <br /> Site amenity replacement on 10 year interval per industry standards. <br />o Inspection by staff quarterly. Adjust interval according to <br />inspection program. <br /> Play structure replacement on 20 year interval per industry standards. <br />Replacement includes all above components and concrete replacement, <br />included in above intervals. <br />o Inspection by staff quarterly. Adjust interval according to <br />inspection program. <br /> <br />5.4 Volley ball and bocce courts: <br /> <br />Condition Rank Description of Condition <br />1 Very good condition – brand new – only <br />normal maintenance required <br />2 Good condition – minor defects only, minor <br />maintenance required (5%) <br />6 <br />12 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.