My WebLink
|
Help
|
About
|
Sign Out
Home
2018-12-4_PR_Comm_Min
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Minutes
>
2018
>
2018-12-4_PR_Comm_Min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2019 11:18:53 AM
Creation date
1/4/2019 11:18:53 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ROSEVILLE PARKS AND RECREATION COMMISSION <br />MEETING MINUTES FOR <br />December 4, 2018 6:30 p.m. <br />PRESENT:Baggenstoss,Bole,Gelbach,Heikkila,Hoag,Newby,O’Brien, <br />Quick,Stoner, Warzecha <br />ABSENT: <br />STAFF: Brokke, Christensen <br /> <br />1) INTRODUCTIONS <br /> <br />2) ROLL CALL/PUBLIC COMMENT <br />3)APPROVAL OF MINUTES –NOVEMBER1,2018MEETING <br />Commissioner Newbymoved to approve the November1, 2018meeting minutes. <br />Commissioner Hoag seconded. Motion passed unanimously. <br /> <br />4) DISCUSS COORDINATION EFFORT WITH ROSEVILLE SCHOOL <br />IMPROVEMENTS <br />Staff provided details on the ongoing working relationship with Roseville Area School <br />District 623 (School District) and the coordination between the city and school district for <br />current and future construction activities. <br /> <br />Staff outlined a Master Timeline, provided by the School District, which highlighted <br />Roseville specific locations. Updates/projects that will impact Parks and Recreation <br />programs and affiliated groups include: <br /> <br />Roseville Area High School (RAHS) <br /> A new auditorium will be added at RAHS. As part of the 1995 contract with the <br />School District, the city has the opportunity to utilize available space from the <br />School District. However, due to limited availability the only current use the city <br />has is for the Roseville School of Dance Recital in June. With an additional <br />auditorium there may be opportunities for additional use. <br /> Staging for the school building construction projects will be in the lower parking <br />lot near the gymnastics center entrance. This will require ongoing communication <br />and collaboration to ensure that activities and special events (Rosefest Parade) are <br />minimally impacted. <br /> <br /> <br /> <br />1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.