My WebLink
|
Help
|
About
|
Sign Out
Home
2019_01-22_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2019
>
2019_01-22_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 2:04:30 PM
Creation date
2/1/2019 1:56:27 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/22/2019
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />V <br />N <br />N <br />W <br />D <br />10 ACRE SITE SCHEME E AREA SUMMARY <br />10 ACRE NEW SITE m <br />PROS: <br />+IMPROVE VEHICULAR CIRCULATION VEHICLE STORAGE 59,700 SF <br />+FUTURE REPAIR BAY/SHOP EXPANSION FUTURE VEHICLE STORAGE 20,500 SF o P <br />+COVERED STORAGE IN YARD(0 <br />+NO OFF-SITE STORAGE REPAIR BAY 11,300 SF n <br />FUTURE REPAIR BAY 3800 SF <br />+FURTURE VEHICLE STORAGE EXPANSION o L <br />+FUTURE OFFICE EXPANSION METER/SIGN SHOPS 4200 SF N a <br />WASH BAY 1600 SF <br />+ACCOMODATE 30 YEAR PROJECTED NEEDS V <br />MEZZANINE STORAGE 10,700 SF <br />STORAGE 1600 SF <br />CONS: FUTURE OFFICE 9800 SF a <br />-PINGING 10 ACRE SITE IN CENTRAL OFFICE 11.300 SFY <br />a` o <br />ROSEVILLE <br />TOTAL FUTURE BLDG AREA 134,500 SF <br />O <br />EMPLOYEE PARKING 40 SPACES <br />VISITOR PARKING 10SPACES <br />FUTURE PARKING EXPANSION 12 SPACES <br />TOTAL PARKING 62 SPACES <br />Z <br />SALT/SAND STORAGE 5,800 SF :n <br />COVERED STORAGE 3,600 SF � p <br />TOTAL YARD YARD STORAGE 84.800 SF <br />STORAGE TOTAL YARD AREA 217,300 SF U <br />10 ACRES 84,800 SF Q LL <br />z <br />Y <br />r- J - <br />1 <br />I <br />_ I <br />it <br />MP KIN <br />LuFUTURE <br />a <br />I <br />I <br />4 S <br />EXPANSION — <br />I Y <br />.I <br />800 <br />9 SF <br />- O <br />Lu <br />POND <br />9 <br />PATIO I W <br />j I z fU o <br />u) U) Y � <br />j FUTURE E ST G 0 o OFFICES Q U <br />EXPANSION 700 F to 11,300 SF o a <br />20,500 SF 0 0 <br />O <br />-- -- - - -'� U <br />U) <br />-- - - - --- - -- --_ - �.:.1 > 3 <br />- <br />�7NS <br />J e� <br />- - - REPAIR BAYS ¢ <br />¢ <br />11,3)0 SF74-_ <br />Y <br />- - - N <br />.i <br />.,4 4_. <br />¢ <br />FUTURE EXPANSION _LL <br />I V <br />i - <br />- w <br />- 3 800 SF <br />:1 <br />�, U - <br />- - L <br />`•SALT/SAND - <br />LU <br />a <br />0 <br />W <br />LUJ k: <br />U Fn <br />(n U <br />1 SCHEME E: GENERIC NEW BUILDING - SITE PLAN 10 ACRES , ° g= <br />E0.1 c 1 = 80'-0 0' 40' 80' 160' <br />
The URL can be used to link to this page
Your browser does not support the video tag.