Laserfiche WebLink
Attachment B <br />2019 Category A City: ROSEVILLE <br />a Step 2 GreenStep City as of June 2015 <br />(joined July 2014) <br />Which assessment? Preliminary: for city review ❑✓ Final: May 1" recommendation to LMC ❑ <br />Assessor and date: Philipp Muessig, 3/7/19 <br />Total Bps done: 18 All required Bps done? NO BP distribution requirements met? YES <br />Recommend June public recognition at: Step 3 <br />Recognition at a Step 3 level involves, at a minimum, completing the following actions: <br />• 11.1 [complete streets] <br />• 15.1 [purchasing policy] <br />• 24.2 [goals/outcome measures] <br />• 29.1 [climate adaptation: hazard communications/shelter] <br />* note: requirements are for Step 3 recognition <br />Best practices (required in bold) BP implemented? Action summary by # and star level achieved <br />Action rules (req. actions in bold) <br />YES <br />BUILDINGS: distribution requirement is 2 Bps; are 2 BPs done? <br />1. Public <br />1.1 COMPLETE @ 1 STAR <br />Actions 1 & 2; & one action <br />YES <br />1.2 COMPLETE @ 2 STARS —motion detectors added to City Hall rooms in <br />from actions 3-7 <br />2012; 2015 finished changing all building lights to LED, updated boiler; <br />starting to analyze the B3 data for savings <br />1.5 COMPLETE @ 2 STARS -- new fire station equivalent to LEED silver, <br />with geothermal heating, maximum use of daylight. <br />1.7 COMPLETE @ 2 STARS -- Oval Skating Rink -geothermal for heat/cool <br />& making ice; waste heat and ground source energy to warm buildings <br />2. Private <br />2.1 COMPLETE @ 3 STARS -- "Living Smarter" campaign includes <br />any two actions <br />YES <br />nationally recognized Green Remodeling Plan Book Oust updated); 200 <br />energy audits with Xcel Energy per year. <br />2.5 COMPLETE @ 2 STARS -- Water Sense Partner; code for landscaping <br />that improves ground water quality and reduces storm water runoff. <br />3. New <br />action 1 or 2; one from 3-5 <br />4. Lighting/Signals <br />4.1 COMPLETE @ 2 STARS-- LED Retrofit Plan, all city bldg. ext. lights <br />2 actions with one from 5-8 <br />YES <br />2011-2015 <br />4.2 COMPLETE @ 1 STAR — all signals LEDs <br />4.3 signals claimed under 4.2; 4.3 is for overhead street lights <br />4.5 COMPLETE @ 2 STARS <br />4.6 COMPLETE @ 1 STAR -- 25% relamped <br />5. Reuse <br />YES <br />5.1 COMPLETE @ 3 STARS —green remodeling, & historic, plan books; <br />any one action <br />residential energy efficiency incentives <br />LYES <br />LAND USE: 2 Bps required; are 2 Bps done? <br />6. Comp Plan <br />YES <br />F6.1 COMPLETE @ 1 STAR -- 2009 <br />Actions 1 & 2 <br />6.2 COMPLETE @ 3 STARS-- Individual ordinances are introduced with <br />purposes throughout the city code <br />