My WebLink
|
Help
|
About
|
Sign Out
Home
2019_11-26_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2019
>
2019_11-26_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2019 3:17:17 PM
Creation date
11/22/2019 3:10:31 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/26/2019
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
developing a 2020 drainage improvement project to alleviate some of these flooding concerns. <br />Staff has already identified several projects for 2020. Some of the projects include: <br />Pavement Management Storm Water Upgrades: As part of the pavement <br />management project staff is looking at replacing or adding infrastructure to areas <br />that have had flooding issues. <br />Staff will work with Ramsey Washington Metro Watershed District to install an <br />underground storm water system at St Rose of Lima This project will help <br />reduce flooding in the neighborhood and provide some water quality treatment. <br />Other Improvements <br />35W MnPASS Project (MNDOT): Construct MnPASS Express Lanes (one lane in each <br />direction) in the middle of existing I-35W between County Road C in Roseville and Lexington <br />Avenue (County Rd 17) in Blaine. Repave I-35W and ramps between County Road C in <br />Roseville to just north of Sunset Ave (County Road 53) in Lino Lakes. Replace and repair <br />bridges along the project area. Install noise walls on the east side of I-35 W just north of the <br />County Road C ramps to County Road D. Road shoulder preparation (fall 2018): Repairing road <br />shoulders and constructing crossovers on I-35 W north of County Road C. Contract will be <br />awarded in October to Ames Construction which had the winning Design/Build Proposal. Total <br />cost is $208 million. Major road work will begin Spring 2019. <br />County Road C Reconstruction Project (Ramsey County): The County will complete <br />reconstructing County Road C between Highway 88 in St Anthony and Long Lake in Roseville <br />in 2020. Work remaining includes installing the new pathways and installing turn lanes. <br />Lexington Avenue Resurfacing (Ramsey County): Ramsey County will complete a mill and <br />overlay on Lexington Avenue between TH 36 and County Road C2. As part of the project the <br />City will replace the pedestrian flasher near Oakcrest. <br />Signal Replacements: MnDot will replace the signal lights and improve ADA curb ramps at <br />Snelling and County Road C2 and Snelling and Roselawn. The City has some cost participation <br />for these improvements. <br />The overall cost of the Public Works Work Plan is approximately $5-6 million dollars. <br />Recommended Action: <br />Comment on the 2020 work plan. <br />Attachments: <br />A. Preliminary Project Map <br />B. Proposed PMP Projects <br />C. Proposed Watermain Projects <br />D. Proposed Sanitary Projects <br />E. Proposed Storm Projects <br />F. Proposed Pathway Projects <br />
The URL can be used to link to this page
Your browser does not support the video tag.