My WebLink
|
Help
|
About
|
Sign Out
Home
Ord_1578
Roseville
>
City Council
>
City Council Ordinances
>
1500
>
Ord_1578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 4:43:22 PM
Creation date
12/27/2019 4:43:20 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Meeting Date
12/2/2019
Meeting Type
Regular
Ordinance #
1578
Ordinance Title
A Ordinance adopting Chapter 314.05, 2020 Fee Schedule
City Code Chapter Amendment
314.05
Ordinance Summary
A Ordinance adopting Chapter 314.05, 2020 Fee Schedule
Ordinance Date Passed
12/2/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville <br /> 2020 Adopted Fee Schedule <br /> Electrical Permit Fees:Community Development <br /> City 2019 2020 <br /> Electrical Permit Fee Description Code Amount Amount Comments <br /> Minimum fee n/a $ 40.00 $ 45.00 No refunds available <br /> Services,changes for services: <br /> 0 to 300 amp n/a $ 50.00 _$ 55.00 <br /> 400 amp n/a 58.00 71.00 <br /> 500 amp n/a 72.00 87.00 <br /> 600 amp n/a 86.00 103.00 <br /> 800 amp n/a 114.00 135.00 <br /> 1,000 amp n/a 142.00 167.00 <br /> 1,100 amp n/a 156.00 183.00 <br /> 1,200 amp n/a 170.00 199.00 <br /> Add$16 for each additional 100 amps <br /> Circuits,changes for services: <br /> 0 to 100 amp n/a $ 8.00 $ 9.00 <br /> 101 to 200 amp n/a 15.00 15.00 <br /> 201 to 300 amp n/a 20.00 21.00 <br /> 301 to 400 amp n/a 25.00 27.00 <br /> 401 to 500 amp n/a 30.00 33.00 <br /> 501 to 600 amp n/a 35.00 39.00 <br /> 601 to 700 amp n/a 40.00 45.00 <br /> Add$6 for each additional 100 amps <br /> Solar Fees: <br /> Okw-5kw n/a 90.00 <br /> 5.lkw-10kw n/a 150.00 <br /> 10.lkw-20kw 225.00 <br /> 20.1kw-30kw n/a 300.00 <br /> 30.1kw-49.9kw n/a 375.00 <br /> 50kw-and larger n/a 400.00 <br /> Add$25 for each additional 10kw n/a 25.00/10kw <br /> Residential panel replacement n/a $ 100.00 $ 110.00 <br /> Residential sub panel n/a 40.00 45.00 <br /> Minimum fee: <br /> Inspection only n/a 40.00 45.00 Plus$1 State surcharge <br /> Rough-in&final n/a 80.00 90.00 Plus$1 State surcharge <br /> Single-family dwelling/townhouse<200 amps* n/a 175.00 190.00 Plus$I State surcharge <br /> Apartment buildings(per unit) n/a 70.00 80.00 Excludes cover svc,unit feeder <br /> &house panels <br /> Swimming pool(up to two inspections) n/a 80.00 90.00 <br /> Additions,remodels,basement additions n/a 80.00 90.00 Up to 10 circuits&2 inspectio <br /> Accessory structure: <br /> Panel n/a 50.00 55.00 <br /> Per circuit n/a 8.00 9.00 <br /> Inspection n/a 80.00 90.00 <br /> Traffic signals(per standard) n/a 7.00 8.00 <br /> Street&parking lot lights(per standard) n/a 4.00 5.00 <br /> Transformers&Generators: <br /> Up to 10 KVA n/a 10.00 5.00 <br /> 11-74 KVA n/a 40.00 40.00 <br /> 75-299 KVA n/a 60.00 60.00 <br /> 300+KVA n/a 150.00 165.00 <br /> Retro-fit lighting(per fixture) n/a 0.65 0.85 <br /> Sign transformer(each) n/a 8.00 9.00 <br /> Low voltage fire alarm,low voltage heating and air cor n/a 0.75 0.85 <br /> Re-inspection fee(in addition to others) n/a 40.00 45.00 <br /> Hourly rate for carnivals n/a 90.00 <br /> Comments: <br /> ' Fee covers a maximum of three inspections <br /> **Permit fee is doubled if work is started before permit is issued <br /> *"Minimum fee electrical permits are not refundable <br />
The URL can be used to link to this page
Your browser does not support the video tag.