My WebLink
|
Help
|
About
|
Sign Out
Home
2020_0323_CCPacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2020
>
2020_0323_CCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2020 3:16:49 PM
Creation date
3/25/2020 4:13:15 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Minutes
Meeting Date
3/23/2020
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2020 Capital Improvement Plan <br /> Project/Initiative Summary <br />Department/Division: Public Works / Engineering <br />Project/Initiative Title: Vehicle Replacement <br />Total Estimated Cost: $242,500 <br />Funding Source: PW Vehicle and Equipment Fund (Property Taxes) <br />Annual Operating Budget Impact: N/A <br /> <br /> <br /> <br />Project/Initiative Description: <br />Continuing with the practice of replacing vehicles and equipment in a timely manner to reduce <br />maintenance costs and down time and to maximize the trade in or resale value of the asset, Public Works <br />is proposing to replace the following: <br /> 2008 - 3 Ton Dump truck with Plow ($210,000) <br /> 2008 - ½ Ton Pickup truck ($30,000) <br />Location: <br />Not applicable. <br />16 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.