Laserfiche WebLink
6/15/2020 <br />Q54 What training did inspectors receive? Check all that apply. <br />19 University of Minnesota Erosion and Stormwater Management Certification Program <br />❑ Qualified Compliance Inspector of Stormwater (QCIS) <br />❑ Minnesota Laborers Training Center Stormwater Pollution Prevention Plan Installer or Supervisor <br />❑ Minnesota Utility Contractors Association Erosion Control Training <br />❑ Certified Professional in Erosion and Sediment Control (CPESC) <br />❑ Certified Professional in Stormwater Quality (CPSWQ) <br />❑ Certified Erosion, Sediment and Storm Water Inspector (CESSWI) <br />❑ Other <br />Q55 Between January 1, 2019 and December 31, 2019, did you modify your BMPs, measurable goals, or future <br />plans for your construction site stormwater runoff control program? [Part IV.B.] <br />Q Yes <br />No <br />MCM 5: Post -Construction Stormwater Management <br />The following questions refer to Part III.D.5. of the Permit. <br />Q56 Do you have a regulatory mechanism which meets all requirements as specified in Part III.D.5.a. of the <br />Permit? <br />p Yes <br />Q No <br />Q57 What approach are you using to meet the performance standard for Volume, Total Suspended Solids (TSS), <br />and Total Phosphorus (TP) as required by the Permit? [Part III.D.5.a.(2)] <br />Check all that apply. <br />Refer to the link http://www.pca.state.mn.us/index.php/view-document.html?gid=17815 for guidance on <br />stormwater management approaches. <br />Q Retain a runoff volume equal to one inch times the area of the proposed increase of impervious surfaces on -site <br />❑ Retain the post -construction runoff volume on site for the 95th percentile storm <br />Q Match the pre -development runoff conditions <br />❑ Adoptthe Minimal Impact Design Standards (MIDS) <br />❑ An approach has not been selected <br />❑ Other method (Must be technically defensible--e.g. based on modeling, research and acceptable engineering practices) <br />Q58 Do you have written Enforcement Response Procedures (ERPs) to compel compliance with your post - <br />construction stormwater management regulatory mechanism(s)? [Part 111.B.] <br />Q Yes <br />p No <br />Q59 Between January 1, 2019 and December 31, 2019, did you modify your BMPs, measurable goals, or future <br />plans for your post -construction stormwater management program? [Part IV.B.] <br />p Yes <br />QQ No <br />MCM 6: Pollution Prevention/Good Housekeeping for Municipal Operations <br />The following questions refer to Part III.D.6. of the Permit. <br />https://survey.mn.gov/siam/suweylanding/printerviewer.asp?sid=d5a63c444a944513bO6ce6l25555el be 10/13 <br />