Laserfiche WebLink
Kimley>Morn <br />The project study area that was previously agreed upon by City of Roseville and Ramsey County staff as <br />part of the 2015 traffic study will be used for this traffic study. The study area is bounded by Fairview Avenue <br />to the west, County Road B2 W to the north, Snelling Avenue to the east, and TH 36 to the south. <br />The following intersections are included in the project's study area: <br />• Fairview Avenue & TH 36 (EB) <br />• Fairview Avenue & TH 36 (WB) <br />• Fairview Avenue & Rosedale Center Driveway #1 <br />• Fairview Avenue & County Road B2 W <br />• County Road B2 W & Rosedale Center Driveway #2 <br />• County Road B2 W & Brooks Avenue (Rosedale Commons Driveway) <br />• County Road B2 W & Rosedale Center Driveway #3 <br />• County Road B2 W & Snelling Avenue (SB) / Rosedale Center Driveway #4 <br />• County Road B2 W & Snelling Avenue (NB) <br />• Major internal ring road intersections <br />Exhibit 2 provides the locations of the study intersections, and their associated lane geometries. All study <br />intersections are signalized currently, except for the major internal ring road intersections. <br />GROWTH ASSUMPTIONS <br />The South Campus Master Plan is expected to be completed within five (5) years. The future year analysis <br />will consist of a Short -Term (2024) and Long -Term (2040) time periods. <br />Due to minimal growth in historic traffic volumes in this study area (based on MnDOT counts and <br />comparison of turning movement counts to the 2015 traffic study), an areawide annual growth rate of 0.5% <br />per year was applied to the TMCs at all the study area intersections to obtain Short -Term (2024) and Long - <br />Term (2040) background traffic volumes. Growth was not applied to the turning movements going to or <br />coming from the different retail centers in the area. <br />Rosedale Center I Traffic Impact Analysis <br />January 2020 Update <br />