My WebLink
|
Help
|
About
|
Sign Out
Home
2020_08-25_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2020
>
2020_08-25_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2020 11:52:08 AM
Creation date
9/18/2020 11:49:28 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Formatted: 1 <br />ifl Spp4i °^�ao..- 01 -2-ry"' °«a is ^hapta- lH as 4ieH' Before any permit shall be issued, the following <br />conditions shall be complied with: <br />A. Certification by Public Works Director: No permit shall be issued to tap or connect with any <br />water main of the City directly or indirectly from any lot or tract of land unless the Public <br />Works Director shall have certified: <br />1. That such lot or tract of land has been assessed for the cost of construction of the water <br />main with which the connection is made; or <br />2. If no assessment has been levied for such construction cost, the proceedings for levying <br />such assessment have been or will be completed in due course; or <br />3. If no assessment has been levied and no assessment proceedings will be completed in due <br />course, that a sum equal to the portion of cost of constructing said water main would be <br />assessable against said lot or tract has been paid to the City. (Ord. 388, 4-22-63; Md. 1995 <br />Code) <br />B. Additional Connection Fee: <br />1. If no such certificate can be issued by the Public Works Director, no permit to tap or <br />connect to any water main shall be issued unless the applicant shall pay an additional <br />connection fee which shall be equal to the portion of the cost of construction of the said <br />main which would be assessable against said lot or tract to be served by such tapping <br />connection, including interest at a rate equal to the interest rate of the original assessment <br />and continuing for a period of 20 years or the amount of years the assessment was payable, <br />whichever is less. Interest may be waived or decreased when it is determined by the Public <br />Works Director that the improvement was not subject to utilization until a later date. <br />2. The assessable cost is to be determined by the Public Works Director upon the same basis <br />as any assessment previously levied against other property for the said main. If no such <br />assessment has been levied, the assessable cost will be determined upon the basis of the <br />uniform charge which may have been or which shall be charged for similar tapping or <br />connection with such main, determined on the basis of the total assessable cost of the main, <br />
The URL can be used to link to this page
Your browser does not support the video tag.