Laserfiche WebLink
a visual pumping test of sufficient duration to determine the yield which shall be of a <br />minimum rate of ten (10) gallons per minute. Within iex-4aysten days after such a test of a <br />well, the well driller shall file an affidavit with the Chef Code Enforcement Officer setting <br />forth the results of the test, the capacity of the well, the pumping level, the depth of casing <br />from grade and a description of the screen or rock formation. (Ord. 276, 5-19-1959; 1995 <br />Code) <br />G. Well Pumps: No person shall install or replace a pump without first obtaining a permit to do <br />so. Application for a permit to install or replace a pump for a well shall be made in writing <br />to the Chef Code Enforcement Officer and shall state the manufacturer, type, horsepower <br />and rating of the proposed pump to be installed or replaced. The permit fee shall be set by <br />City Council resolution. (Ord. 873, 12-22-1980; 1995 Code) <br />801.28: PRIVATE USE OF WATER TOWERS: <br />A. Permit Required: No person shall in any way use any Municipal water tower for private use <br />without first obtaining a permit from the City Council to do so. <br />B. Fee: If the permit is issued by the City Council, it shall be valid only as long as the applicant <br />pays to the City the fee as set by City Council resolution. The permit must be renewed <br />annually. <br />C. Cancelling Permits: The City Council may at any time cancel any permit issued to a private <br />person to in any way use any City Municipal water tower by returning to the person the <br />unused portion of the annual fee. (Ord. 419, 4-20-1964; 1995 Code) (Ord. 1504 07-11-16) <br />