My WebLink
|
Help
|
About
|
Sign Out
Home
2020_08-25_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2020
>
2020_08-25_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2020 11:52:08 AM
Creation date
9/18/2020 11:49:28 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Repaired 1 broken water main on Lexington south of Josephine. The water main <br />had a longitudinal split that required 6 feet of pipe replacement. This water main <br />break damaged Lexington Avenue, curb and gutter and the walking path. <br />o Continued the 2020 hydrant flushing program. <br />o Continued the 2020 sewer inspection / cleaning programs. <br />o Continued working with our SCADA integrator (AE2S) on SCADA upgrades for <br />2020. <br />o Continued exercising 12" and larger -sized water main valves. <br />o Worked with contractor installing pump 1 at St. Croix storm water lift station. <br />Pump 1 needed to be rebuilt and was put back into service. <br />o Worked the contractor to reinstall pump 6 at the Booster. This was warranty <br />work. <br />Attachments: <br />A: <br />2020 Roseville Project Map <br />B: <br />2020 PMP Project Map <br />C: <br />2020 Pathway Project Map <br />D: <br />August Development Activity Report <br />E: <br />Sustainability Update <br />
The URL can be used to link to this page
Your browser does not support the video tag.