Laserfiche WebLink
o Repaired 1 broken water main on Lexington south of Josephine. The water main <br />had a longitudinal split that required 6 feet of pipe replacement. This water main <br />break damaged Lexington Avenue, curb and gutter and the walking path. <br />o Continued the 2020 hydrant flushing program. <br />o Continued the 2020 sewer inspection / cleaning programs. <br />o Continued working with our SCADA integrator (AE2S) on SCADA upgrades for <br />2020. <br />o Continued exercising 12" and larger -sized water main valves. <br />o Worked with contractor installing pump 1 at St. Croix storm water lift station. <br />Pump 1 needed to be rebuilt and was put back into service. <br />o Worked the contractor to reinstall pump 6 at the Booster. This was warranty <br />work. <br />Attachments: <br />A: <br />2020 Roseville Project Map <br />B: <br />2020 PMP Project Map <br />C: <br />2020 Pathway Project Map <br />D: <br />August Development Activity Report <br />E: <br />Sustainability Update <br />