My WebLink
|
Help
|
About
|
Sign Out
Home
2020_0727_CCPacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2020
>
2020_0727_CCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2020 3:21:20 PM
Creation date
10/26/2020 3:20:20 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Minutes
Meeting Date
7/27/2020
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
33 Feedback from the Council and the public will be used to further develop the concepts, provide some <br />34 analysis on staging and implementation and produce some very preliminary and conservative cost <br />35 estimates. This information will be presented to the Council in August. <br />36 Prior to that, an additional public engagement effort will start up within the next two weeks. This <br />37 will include another online survey with much more detailed questions about specific elements and <br />38 impacts of the concepts as well as a walking tour of the City Campus. <br />39 It is anticipated a final report will be presented to the Council sometime in September or October. <br />40 F INANCIAL I MPACTS <br />41 Preliminary cost estimates for the various concepts are planned to be presented at a Council meeting <br />42 in August. There are currently no planned improvements or capital expenditures as a result of this <br />43 study. <br />44 S TAFF R ECOMMENDATION <br />45 Receive an update on the City Campus Master Plan from staff, BKV Group and Zan Associates and <br />46 provide feedback on the information presented. <br />47 R EQUESTED C OUNCIL A CTION <br />48 Receive an update on the City Campus Master Plan from staff, BKV Group and Zan Associates and <br />49 provide feedback on the information presented. <br />Prepared by: Marc Culver, Public Works Director <br />Attachments: A: Presentation <br />B: Survey Results <br />C: Social Media Public Comment <br />Page 2 of 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.