Laserfiche WebLink
OPTION C <br />CIVIC CAMPUS MASTER PLAN <br />all <br />site <br />- <br />functions <br />fronted residential <br />- <br />site area for <br />routing Woodhill Dr. to <br />temporary relocation of <br />- <br />construction process <br />flexible building plan <br />maintenance activities <br />Maintenance and City departmentsthe northlotsrequire all during <br />Woodhill Drive RetainedWoodhill Drive RetainedMaintenance Facility OffMaintenance Facility Displaces Howard Johnson Park <br />Woodhill Drive Rerouted <br />Woodhill Drive Adjusted <br />CITY OF ROSEVILLE CIVIC CAMPUS MASTER PLAN STUDY <br />Most generous Most direct fueling access for <br />Requires reLimited green space on campusCreated doubleLimited available area for VFWPhasing of construction would <br />MASTER PLAN OPTIONS:A.1 A.2 B C D.1 D.2 SUMMARY+ + Screened Maintenance work areas + ----- <br /> <br />