My WebLink
|
Help
|
About
|
Sign Out
Home
2020_0727_CCPacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2020
>
2020_0727_CCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2020 3:21:20 PM
Creation date
10/26/2020 3:20:20 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Minutes
Meeting Date
7/27/2020
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s. <br />current <br />e <br />proposed <br />th <br />e <br />th <br />re <br />f <br />and reviewed by <br />ed <br />explo <br />y <br />Master Plan process and <br />r <br />analyz <br />fo <br />on aspects o <br />be <br />gy <br />k <br />ener <br />8/7) <br />e <br />(Dates to be confirmed) <br />II <br />citizens to physicall <br />RT <br />positiv(7/22 <br />responses will <br />PA <br />e <br />age <br />- <br />UR <br />ey <br />Resident familiarity with the existing camp <br />EncourElicit specific feedbac <br />options. <br />gn <br />Project Team <br />e <br />SOCIAL MEDIA POSTINGS Purpose: Cultivatconnect residents with resources.SELF-GUIDED TO Purpose:campus. Outcome:ONLINE SURVEY Purpose:desiOutcome: Survth <br />COMMUNITY OUTREACH <br />guided tour) <br />- <br />self <br />through <br />now <br />(Open <br />7/14/20 <br />of <br />PART I <br />- <br />as <br />Survey responses will be analyzed and reviewed <br />Connect community with Master Plan Process. Elicit <br />: Gateway for Master Plan information, connecting : <br />SURVEY <br />CITY OF ROSEVILLE CIVIC CAMPUS MASTER PLAN STUDY <br />SUMMARY OF COMMUNITY OUTREACH:MASTER PLAN WEBSITE Purposeresidents with project information and engagement resources.ONLINE 154 responses Purposepreliminary feedback about the Civic <br /> Campus, connection with City resources, and vision.Outcome: by the Project Team <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.