Laserfiche WebLink
Guidant John Rose Minnesota OVAL Project and Cost List 1-15-19 <br />Modified 7-1-20 <br />Based on Professional Condition Assessment <br />and City Capital Improvement Program <br />1.Refrigeration Plant -Current condenser (evaporation tower)is original to system, has <br />outlived its useful lifeand isin need of replacement <br />Compressors$ 140,000 <br />Chiller $ 830,000 <br />Condenser and Pumps$ 340,000 <br />Treatment/Ammonia Detection, Electrical Systems$ 250,000 <br />2.Brine Pumping Systemscurrent pumps are original and are in need of replacement <br />Brine Replacement and Filtration $60,000 <br />Pumps$ 100,000 <br />Expansion Tanks$32,000 <br />3.Concrete Refrigeration Rink -Expansion joints are being undermined and in need of <br />repair and upgrade to newer technology <br />Repair Expansion Joints $ 200,000 <br />New Insulated Grade Beams with expansion joints$ 525,000 <br />4.Perimeter Paving$ 90,000 <br />Mill and blacktop perimeter(training Track)of OVAL. <br />5.Perimeter and UndergroundDrainage System$142,000 <br />Mill and blacktop perimeter(training track)of OVAL/turf improvements. All this <br />is to improve drainage systems to prevent water from undermining the slab <br />6.Padding and Fence System$ 450,000 <br />Replace fence surrounding the OVAL to secure padding system <br />Replace padding system around to OVAL to meet world competition standards <br />Subtotal before Contingency and Soft Costs $3,159,000 <br />Contingency and Soft costs$821,340 <br />TOTAL WITH CONTIGENCTOTAL WITH CONTIGENCY AND SOFT COSTS Y AND SOFT COSTS $ 3,$ 3,980,340980,340 <br />