My WebLink
|
Help
|
About
|
Sign Out
Home
2020_11-24_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2020
>
2020_11-24_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2020 1:58:59 PM
Creation date
11/20/2020 1:56:56 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MASTER PLAN OPTIONS: <br />A.2 - Woodhill Drive Retained <br />I <br />KEY PHASING POINTS <br />l . Retain License and <br />Maintenance. <br />2. Build new Maintenance <br />structures to eliminate need <br />for off -site leased storage. <br />3. Phase facilities and growth <br />in pieces over time. <br />WOODHILL DRIVE <br />--- <br />-- - - - - -- <br />— I i Id6 <br />' P <br />HOWARD <br />JOHNSON PARK <br />I <br />;> <br />O <br />a <br />IZ <br />0 <br />z <br />x <br />° 1 <br />I <br />114 <br />�6 <br />IJ P <br />,4 <br />P3 <br />J E I <br />I <br />HWY C <br />CITY OF ROSEVILLE /�RTEL B K V <br />CIVIC CAMPUS MASTER PLAN STUDY OPTION A.2 - PHASE I �CkCHITECTS c R 0 u P <br />
The URL can be used to link to this page
Your browser does not support the video tag.