My WebLink
|
Help
|
About
|
Sign Out
Home
2020_11-24_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2020
>
2020_11-24_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2020 1:58:59 PM
Creation date
11/20/2020 1:56:56 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County Road B2 & Lexington Avenue <br />(Intersection improvement project) <br />Lf'-..JR <br />AREAS WITH POTENTIAL ROW IMPACTS <br />IF CR B2 IS WIDENED TO THE NORTH <br />update peaestrlan ramps to oe HUH compilant <br />• Update signal system and new APS <br />4. <br />• Dedicated left and right turn lanes on CR 62 only <br />AREAS WHERE TRAIL WILL NEED TO BE ADJUSTED <br />IF CR B2 IS WIDENED TO THE SOUTH <br />• Project Purpose <br />• Intersection Improvement <br />• Add dedicated LT and RT lanes at CR <br />B2 <br />• New Signal System <br />• Improve pedestrian and bicycle <br />facilities <br />• Pedestrian ramp — update to ADA <br />Standards <br />• APS (Audible Pedestrian Signal) <br />• Bump -Outs <br />• Lead Phase for Ped Crossing <br />• Other improvements <br />• Retaining Walls <br />• Pavement Resurfacing <br />• Drainage System <br />RAMSEY � n /C <br />COUNTY V V J <br />
The URL can be used to link to this page
Your browser does not support the video tag.