Laserfiche WebLink
II2021 Public Works Work Plan <br />2020 Accomplishments <br />Developments/Permits Construction <br />• Right of Way Permits - 105 Resurfaced 5.81 miles of roadway <br />• New Erosion Control Permits — 42 <br />• Currently opened sites- 58 <br />• Erosion Control Inspections— 1,248 <br />• Building Permits Reviewed — 258 <br />• Traffic Studies for Developments - 3 <br />• Plat Development Reviews - 7 <br />• Resurfaced 0.63 miles of pathways <br />• Install 1.43 miles of new pathways <br />• Replaced 0.21 miles of watermain <br />• Lined 7.1 miles of sanitary sewer <br />• Installed new Iron Enhanced Storm <br />Water Basin near Brenner & Avon to <br />mitigate flooding and provide <br />treatment <br />Maintenance <br />• Meter Replacements— 480 <br />• 85-90% were radio <br />issues. <br />• Watermain Breaks-25 <br />• Plow Events - 20 <br />Miscellaneous <br />• Civic Campus Master Plan Study <br />• Easement & ROW Vacations - 7 <br />• Railroad Quiet Zone Study <br />• Engineering services for Falcon <br />Heights <br />• Over 400 hours <br />