My WebLink
|
Help
|
About
|
Sign Out
Home
2020_11-24_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2020
>
2020_11-24_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2020 1:58:59 PM
Creation date
11/20/2020 1:56:56 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2021 Public Works Work Plan <br />Water Distribution System Projects <br />Booster Station Upgrades <br />• Design of Phase 3 Improvements <br />• Roof Replacement <br />• Replacement of existing roof <br />and skylights <br />• Refurbishment of exterior <br />brick <br />• Refurbishment of interior <br />finishes <br />• Noise attenuation <br />• Lighting enhancements <br />• Communication and security <br />system enhancements <br />• Perimeter security fencing <br />• Installation of additional <br />water supply main to booster <br />station and pressure relief <br />vault <br />Watermain Replacement <br />Replacement of 0.5 miles of <br />watermain <br />• Cleveland Avenue, County Road <br />C2-County Road D <br />NOUN <br />If <br />
The URL can be used to link to this page
Your browser does not support the video tag.