Laserfiche WebLink
2021 Public Works Work Plan <br />Other Agency Projects within Roseville <br />Minnesota Department of Transportation <br />• 35W MnPass Project <br />• 2019-2021 <br />• New MnPass lane from County C to <br />Lexington Avenue in Blaine. <br />3rd Year will begin in April <br />Construct NB lanes 2021 <br />• Signal Replacement of Snelling and County <br />Road C2 <br />• Signal Replacement of Snelling and Roselown <br />Avenue <br />Ramsey County Public Works <br />• Resurface County Road B2 between <br />Fairview Avenue and Hamline Avenue <br />• Install new pathway between <br />Snelling ramps on the north side of <br />B2 under the Snelling Bridge <br />• Replace four signal systems <br />• ADA upgrade <br />Ramsey County <br />Metropolitan Council Environmental <br />Services <br />• No projects planned at this time. <br />METROPOLITAN <br />C O U N C I L <br />Watersheds <br />• Capitol Region Watershed District in R C W D <br />• No projects at this time ►, <br />• Rice Creek Watershed District fi<11 RICE CREEK WATERSHED DISTRICT <br />• Ditch 2, 3, 5 Study <br />• RCD 4 project to convert ditch to a pipe. <br />• Ramsey -Washington Metro Watershed District <br />• St Rose of Lima Underground Project <br />RWMWD <br />Other Utilities j Xcel Energy <br />• Xcel Gas <br />• Replace major gas line on County Road B between <br />Lexington Avenue and Rice Street <br />• 2022 —Replace gas on County Road B between Hamline <br />Avenue and Lexington Avenue. Replace gas on Hamline <br />Avenue between County Road B and County Road B2. <br />