My WebLink
|
Help
|
About
|
Sign Out
Home
2021_03-23_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2021
>
2021_03-23_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2021 2:14:45 PM
Creation date
3/19/2021 2:05:35 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
3/23/2021
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ramsey Cou <br />Ditch Design <br />my Ditch 4 11 <br />PRELIMINARY COST ESTIMATE <br />y*—wfw -- <br />OIIR <br />*i, Uaftcost <br />Quertrty <br />cast <br />MOBILIZATION <br />LS <br />$100,000 <br />1 <br />$100,000 <br />84 -INCH RCP' <br />LF <br />$750 <br />2,425 <br />$1.818,750 <br />IMPORTED FILL" <br />CY <br />$15 <br />46,200 <br />$693,000 <br />INTAKES <br />EA <br />55,000 <br />6 <br />$30.000 <br />MANHOLES <br />EA <br />$50,000 <br />4 <br />$200,000 <br />CONNECT TO EXISTING LATERAL <br />EA <br />$5,000 <br />6 <br />$30,000 <br />CLEARING AND EROSION CONTROL <br />LS <br />$50.000 <br />1 <br />$50,000 <br />Construction Cost <br />$2,921,750 <br />Contingency (25%) <br />$730,438 <br />Total Cost <br />$3,652,188 <br />'Replacing with a 6 -ft x 8 -ft RCBC is estimated to add an addiional $750,000 to the cost <br />"Uti¢ing excess fill from adjacent land parcels (r available) may reduce this cost <br />
The URL can be used to link to this page
Your browser does not support the video tag.