Laserfiche WebLink
Pathway Master Plan <br />Proposed Changes <br />• Eustis Street (extension of segment 22) <br />• Make connection between pathway on Cty Road B and trail south of 135W <br />• Possible future development <br />• City will be reconstructing County Rd B in 2024 and will build new pathway <br />determined. <br />N HIGHWAY 3 E <br />C <br />W <br />O 4 <br />V y <br />O ti <br />G <br />13 <br />n <br />A � <br />n = <br />J <br />y � <br />LN <br />Final design to be <br />