Laserfiche WebLink
Pathway Master Plan <br />Proposed Changes <br />• Segment 2 <br />• County Road C2 West of Snelling <br />• Develop both and on and off -road pathway within the Cty Rd C2 alignment from the west City <br />boundary to Snelling Avenue. The corridor would include a pedestrian bridge across 1-35W <br />