Laserfiche WebLink
Pathway Master Plan <br />Proposed Changes <br />• Lydia Ave <br />• Add pathway to roadway from <br />Snelling Ave to Hamline Ave <br />• Lydia is a collector street with <br />direct signalized access to <br />Snelling Ave resulting in higher <br />volumes of traffic <br />• Currently wide shoulder that is <br />occasionally used for parking <br />• Public input to date has <br />expressed concerns about which <br />side of the street the pathway <br />would be located, impacts to <br />front yards, etc. <br />446 VOW"VNN AM <br />o - - <br />3059 CLAMAm AM <br />29a <br />=uii —IfI 2j 2%971m1 .. <br />3M2 3m+ L, <br />3 anxM m. + <br />3ms <br />9 <br />V3 <br />ME <br />y <br />y ME <br />11 =7 <br />� <br />� <br />3�e <br />= <br />12e1 <br />ME <br />8 F S W <br />YILLWCCC AM <br />2950 <br />J Lr—J 2M9 1 1 M99 I M7 I 191, I 2M9 I AM 9m0) ME 1 288] <br />�� COnmlY a0A0 p W Tr <br />Proposed Pathway Master Plan segment - <br />Lydia Avenue OPmp..d New Pathway Master Plan Segment <br />kt�aii'sriT,r O 500' Buffer from Pathway <br />Parcels within 500 Buller <br />2087 1 1 2909 1 2e91 <br />zMo <br />F 2J92 <br />2922 <br />2 <br />900 <br />2B1 <br />^ <br />^ <br />ID <br />COYIl1Y BOAC C2 W <br />t� TT1 <br />