My WebLink
|
Help
|
About
|
Sign Out
Home
2021_07-27_PWETCpacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2021
>
2021_07-27_PWETCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2021 3:57:29 PM
Creation date
8/2/2021 3:54:54 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/27/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville Pathway Master Plan <br />The results of the scoring exercise will be used by the City to assist in prioritizing future <br />pathway projects as part of the annual capital improvement program update. <br />However, it is important to note the list of preferred projects will not be implemented <br />based on the ranking results, as this list is intended to be updated periodically. In <br />addition, there are several factors that can affect the timing and cost of developing <br />pathway projects. These factors include coordination with planned roadway <br />improvements (when it may be most feasible to construct new pathway segments), <br />the availability of right-of-way, utilities, constructability, and magnitude of project in <br />terms of both length and cost. For example, if a proposed pathway project is located <br />along a roadway that is programmed for reconstruction, then coordinating the <br />pathway improvements with the road improvements is the best opportunity to <br />implement the project (regardless of project ranking). Likewise, the ability for a <br />proposed pathway project to obtain external funding could also accelerate the <br />development of such a project. <br />Page 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.