Laserfiche WebLink
II2022 Public Works Work Plan 0 <br />2021 Accomplishments <br />Developments/Permits Construction <br />• Right of Way Permits - 175 Resurfaced 9.00 miles of roadway <br />• New Erosion Control Permits — 39 <br />• Currently opened sites- 41 <br />• Erosion Control Inspections— 1,123 <br />• Building Permits Reviewed — 305 <br />• Traffic Studies for Developments - 3 <br />• Plat Development Reviews - 4 <br />• Resurfaced 0.75 miles of pathways <br />• Install 3 new pathway segments <br />resulting in 1.1 miles of new <br />pathways <br />• Replaced 0.50 miles of watermain <br />• Lined 7.2 miles of sanitary sewer <br />• Completed 2 major sewer repairs <br />• Installed new underground storage <br />St Rose of Lima Church <br />• Upgraded Gaultier Lift Station and <br />added emergency generator <br />• Resurface 1 parking lot <br />• Added one new pedestrian signal <br />• Upgraded one pedestrian signal <br />Maintenance <br />• Meter Replacements— 739 <br />• 85-90% were radio <br />issues. <br />• Watermain Breaks-23 <br />• Plow Events (2020-2021 <br />Winter) - 21 <br />Miscellaneous <br />• Civic Campus Master Plan Study <br />• Easement & ROW Vacations - 2 <br />• Engineering services for Falcon <br />Heights <br />• Over 1,300 hours <br />